IAC logo
IAC Assessment: NC0111
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0111
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1997
Principal Product animal protein adhesives
NAICS n/a
SIC 2891 - Adhesives And Sealants
Sales $10,000,000-$50,000,000
# of Employees 31
Plant Area (Sq.Ft.) 55,000
Annual Production 20,000,000 Pounds
Production Hrs. Annual 4,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $36,469 1,063,599 kWh $0.03
Electricity Demand $40,508 4,403 kW-months/year $9.20
Natural Gas $22,402 3,874 MMBtu $5.78
TOTAL ENERGY COSTS $102,668
RECOMMENDED SAVINGS* $100,781 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,927
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$21,132
Cost:
$6,877
$18,522 540,152 $15,898 1,728 $(-13,288) (-2,303) - - - - - - $18,522
540,152
kWh
$15,898
1,728
kW-months/year
$(-13,288)
(-2,303)
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$245
Cost:
$233
- - - - $245 42 - - - - - - -
-
kWh
-
-
kW-months/year
$245
42
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$83
Cost:
$94
$37 1,172 $46 5 - - - - - - - - $37
1,172
kWh
$46
5
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$555
Cost:
$55
$438 12,896 $117 13 - - - - - - - - $438
12,896
kWh
$117
13
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$337
Cost:
$986
$129 3,810 $208 23 - - - - - - - - $129
3,810
kWh
$208
23
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$140
Cost:
$125
$140 4,103 - - - - - - - - - - $140
4,103
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,289
Cost:
$5,200
- - - - - - $3,289 107,600 $(-1,000) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,289
107,600
lb
$(-1,000)
-
$
-
-
$
08: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$76,000
Cost:
-
- - - - - - - - - - $76,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$76,000
-
$
TOTAL RECOMMENDED Savings:
$100,781
Cost:
$13,570
$19,266 562,133 $16,269 1,769 $(-13,043) (-2,261) $3,289 107,600 $(-1,000) - $76,000 - $19,266
562,133
kWh
$16,269
1,769
kW-months/year
$(-13,043)
(-2,261)
MMBtu
$3,289
107,600
lb
$(-1,000)
-
$
$76,000
-
$
TOTAL IMPLEMENTED Savings:
$2,927
Cost:
$5,349
$475 14,068 $163 18 - - $3,289 107,600 $(-1,000) - - - $475
14,068
kWh
$163
18
kW-months/year
-
-
MMBtu
$3,289
107,600
lb
$(-1,000)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Ancillary Material Cost Primary Product