IAC logo
IAC Assessment: NC0132
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0132
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1998
Principal Product fiber optic cable
NAICS n/a
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $50,000,000-$100,000,000
# of Employees 215
Plant Area (Sq.Ft.) 100,000
Annual Production 114,854 Thousand Feet
Production Hrs. Annual 8,600
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $279,323 10,777,550 kWh $0.03
Electricity Demand $185,006 17,925 kW-months/year $10.32
Electricity Fees $14,673 - $ -
TOTAL ENERGY COSTS $479,002
RECOMMENDED SAVINGS* $149,017 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$9,465
Cost:
$14,500
$5,789 206,917 $3,676 283 - - - - - - $5,789
206,917
kWh
$3,676
283
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$6,949
Cost:
$11,150
$6,284 224,502 $5,453 420 $(-4,788) (-955) - - - - $6,284
224,502
kWh
$5,453
420
kW-months/year
$(-4,788)
(-955)
MMBtu
-
-
lb
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,486
Cost:
$2,688
$1,520 54,220 $966 74 - - - - - - $1,520
54,220
kWh
$966
74
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,506
Cost:
$2,940
$1,300 46,307 $1,206 93 - - - - - - $1,300
46,307
kWh
$1,206
93
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,455
Cost:
$1,600
$1,455 51,876 - - - - - - - - $1,455
51,876
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$440
Cost:
$1,333
$261 9,379 $179 14 - - - - - - $261
9,379
kWh
$179
14
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,816
Cost:
$13,801
$3,557 127,198 $2,259 174 - - - - - - $3,557
127,198
kWh
$2,259
174
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$900
Cost:
$200
- - - - - - $900 60,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$900
60,000
lb
-
-
$
09: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$119,000
Cost:
$500
- - - - - - - - $119,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$119,000
-
$
TOTAL RECOMMENDED Savings:
$149,017
Cost:
$48,712
$20,166 720,399 $13,739 1,058 $(-4,788) (-955) $900 60,000 $119,000 - $20,166
720,399
kWh
$13,739
1,058
kW-months/year
$(-4,788)
(-955)
MMBtu
$900
60,000
lb
$119,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product