IAC logo
IAC Assessment: NC0135
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0135
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1998
Principal Product Bath towels
NAICS n/a
SIC 2210 -
Sales $50,000,000-$100,000,000
# of Employees 560
Plant Area (Sq.Ft.) 227,000
Annual Production 33,000,000 Pounds
Production Hrs. Annual 8,600
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,318,889 52,145,370 kWh $0.03
Electricity Demand $1,328,645 99,524 kW-months/year $13.35
Electricity Fees $44,732 - $ -
Coal $511,704 150,501 MMBtu $3.40
TOTAL ENERGY COSTS $5,681,337
RECOMMENDED SAVINGS* $819,372 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $170,000
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Coal Water Disposal Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Primary Product Electricity Usage Electricity Demand Coal Water Disposal Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ lb $ $ $ $
01: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$2,630
Cost:
-
- - $2,630 197 - - - - - - - - - - - - -
-
kWh
$2,630
197
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$10,801
Cost:
$5,400
$6,221 245,897 $4,580 343 - - - - - - - - - - - - $6,221
245,897
kWh
$4,580
343
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$2,079
Cost:
$7,200
- - - - $2,079 578 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,079
578
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$16,897
Cost:
$5,200
- - - - - - - - - - $18,897 892,000 $(-2,000) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$18,897
892,000
lb
$(-2,000)
-
$
-
-
$
05: 3.4151 MINIMIZE WATER USAGE Savings:
$16,515
Cost:
$15,000
- - - - $1,773 493 $14,742 9,450,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,773
493
MMBtu
$14,742
9,450,000
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$170,000
Cost:
$750,000
- - - - - - - - - - - - - - $170,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
$170,000
-
$
07: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$600,450
Cost:
$1,500,000
$(-29,095) (-1,150,059) $(-28,516) (-2,136) $(-38,209) (-7,248) - - $696,270 3,018,000 - - - - - - $(-29,095)
(-1,150,059)
kWh
$(-28,516)
(-2,136)
kW-months/year
$(-38,209)
(-7,248)
MMBtu
-
-
Tgal
$696,270
3,018,000
gal
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$819,372
Cost:
$2,282,800
$(-22,874) (-904,162) $(-21,306) (-1,596) $(-34,357) (-6,177) $14,742 9,450,000 $696,270 3,018,000 $18,897 892,000 $(-2,000) - $170,000 - $(-22,874)
(-904,162)
kWh
$(-21,306)
(-1,596)
kW-months/year
$(-34,357)
(-6,177)
MMBtu
$14,742
9,450,000
Tgal
$696,270
3,018,000
gal
$18,897
892,000
lb
$(-2,000)
-
$
$170,000
-
$
TOTAL IMPLEMENTED Savings:
$170,000
Cost:
$750,000
- - - - - - - - - - - - - - $170,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
$170,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Coal Water Disposal Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Primary Product Electricity Usage Electricity Demand Coal Water Disposal Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Primary Product