IAC Assessment: NC0142
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0142
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1998
Principal Product Closures for surgical prcedures
NAICS n/a
SIC 3841 - Surgical And Medical Instruments
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 145,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $224,747 8,747,655 kWh $0.03
Electricity Demand $206,345 21,905 kW-months/year $9.42
Electricity Fees $7,737 - $ -
Natural Gas $68,910 20,986 MMBtu $3.28
TOTAL ENERGY COSTS $508,189
RECOMMENDED SAVINGS* $24,300 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,179
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,463
Cost:
$1,050
$2,463 95,838 - - - - - - $2,463
95,838
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,239
Cost:
-
- - $4,239 450 - - - - -
-
kWh
$4,239
450
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,688
Cost:
$1,200
- - - - $1,688 376 - - -
-
kWh
-
-
kW-months/year
$1,688
376
MMBtu
-
-
lb
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,769
Cost:
$9,000
$2,769 107,855 - - - - - - $2,769
107,855
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$2,977
Cost:
$1,448
$1,718 66,823 $1,259 134 - - - - $1,718
66,823
kWh
$1,259
134
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,279
Cost:
$31,754
$3,831 149,179 $3,448 366 - - - - $3,831
149,179
kWh
$3,448
366
kW-months/year
-
-
MMBtu
-
-
lb
07: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$2,435
Cost:
$10
$1,621 63,013 $814 86 - - - - $1,621
63,013
kWh
$814
86
kW-months/year
-
-
MMBtu
-
-
lb
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$375
Cost:
$200
- - - - - - $375 25,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$375
25,000
lb
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$75
Cost:
-
- - - - - - $75 5,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$75
5,000
lb
TOTAL RECOMMENDED Savings:
$24,300
Cost:
$44,662
$12,402 482,708 $9,760 1,036 $1,688 376 $450 30,000 $12,402
482,708
kWh
$9,760
1,036
kW-months/year
$1,688
376
MMBtu
$450
30,000
lb
TOTAL IMPLEMENTED Savings:
$18,179
Cost:
$34,014
$7,915 308,030 $8,501 902 $1,688 376 $75 5,000 $7,915
308,030
kWh
$8,501
902
kW-months/year
$1,688
376
MMBtu
$75
5,000
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)