IAC logo
IAC Assessment: NC0203
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0203
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2000
Principal Product Knitted fabric
NAICS n/a
SIC 2253 - Knit Outerwear Mills
Sales $5,000,000-$10,000,000
# of Employees 156
Plant Area (Sq.Ft.) 182,640
Annual Production 7,800,000 Pieces
Production Hrs. Annual 7,500
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $161,092 5,295,428 kWh $0.03
Electricity Demand $89,000 10,815 kW-months/year $8.23
Electricity Fees $7,419 - $ -
TOTAL ENERGY COSTS $257,511
RECOMMENDED SAVINGS* $44,621 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,665
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Administrative Changes Increase in Production Electricity Usage Electricity Demand Water Disposal Administrative Changes Increase in Production
$ kWh $ kW-months/year $ Tgal $ $ $ %
01: 4.121 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING Savings:
$5,811
Cost:
$13,000
- - - - $(-2,080) (-216,000) - - $7,891 - -
-
kWh
-
-
kW-months/year
$(-2,080)
(-216,000)
Tgal
-
-
$
$7,891
-
%
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,627
Cost:
-
$1,164 38,394 $1,463 175 - - - - - - $1,164
38,394
kWh
$1,463
175
kW-months/year
-
-
Tgal
-
-
$
-
-
%
03: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$24,784
Cost:
$8,500
$17,219 566,530 $7,565 906 - - - - - - $17,219
566,530
kWh
$7,565
906
kW-months/year
-
-
Tgal
-
-
$
-
-
%
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,597
Cost:
$150
$1,110 35,463 $487 57 - - - - - - $1,110
35,463
kWh
$487
57
kW-months/year
-
-
Tgal
-
-
$
-
-
%
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$630
Cost:
$691
$438 14,361 $192 23 - - - - - - $438
14,361
kWh
$192
23
kW-months/year
-
-
Tgal
-
-
$
-
-
%
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,299
Cost:
$220
$902 29,601 $397 48 - - - - - - $902
29,601
kWh
$397
48
kW-months/year
-
-
Tgal
-
-
$
-
-
%
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,732
Cost:
$849
$2,421 79,719 $1,311 159 - - - - - - $2,421
79,719
kWh
$1,311
159
kW-months/year
-
-
Tgal
-
-
$
-
-
%
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,141
Cost:
$6,000
$930 30,481 $511 61 - - $2,700 - - - $930
30,481
kWh
$511
61
kW-months/year
-
-
Tgal
$2,700
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$44,621
Cost:
$29,410
$24,184 794,549 $11,926 1,429 $(-2,080) (-216,000) $2,700 - $7,891 - $24,184
794,549
kWh
$11,926
1,429
kW-months/year
$(-2,080)
(-216,000)
Tgal
$2,700
-
$
$7,891
-
%
TOTAL IMPLEMENTED Savings:
$10,665
Cost:
$13,841
$2,712 88,218 $2,142 255 $(-2,080) (-216,000) - - $7,891 - $2,712
88,218
kWh
$2,142
255
kW-months/year
$(-2,080)
(-216,000)
Tgal
-
-
$
$7,891
-
%
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ %
Electricity Usage Electricity Demand Water Disposal Administrative Changes Increase in Production Electricity Usage Electricity Demand Water Disposal Administrative Changes Increase in Production