IAC logo
IAC Assessment: NC0211
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0211
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2001
Principal Product Paints and stains
NAICS n/a
SIC 2851 - Paints And Allied Products
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 100,000
Annual Production 6,500,000 Tons
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $105,948 3,934,800 kWh $0.03
Electricity Demand $77,967 8,364 kW-months/year $9.32
Electricity Fees $6,000 - $ -
Natural Gas $156,226 17,198 MMBtu $9.08
TOTAL ENERGY COSTS $346,141
RECOMMENDED SAVINGS* $40,935 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,243
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$23,426
Cost:
$20,000
$(-81) (-3,000) $(-113) (-12) $23,620 2,601 - - - - $(-81)
(-3,000)
kWh
$(-113)
(-12)
kW-months/year
$23,620
2,601
MMBtu
-
-
$
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,719
Cost:
$800
- - - - $1,719 189 - - - - -
-
kWh
-
-
kW-months/year
$1,719
189
MMBtu
-
-
$
-
-
$
03: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$2,014
Cost:
$250
- - - - $2,014 222 - - - - -
-
kWh
-
-
kW-months/year
$2,014
222
MMBtu
-
-
$
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,453
Cost:
$6,000
$3,542 131,175 $2,825 300 $(-4,914) (-541) - - - - $3,542
131,175
kWh
$2,825
300
kW-months/year
$(-4,914)
(-541)
MMBtu
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,002
Cost:
$1,028
$590 21,864 $412 44 - - - - - - $590
21,864
kWh
$412
44
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$2,631
Cost:
-
- - $2,631 280 - - - - - - -
-
kWh
$2,631
280
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,506
Cost:
$1,239
$751 27,814 $481 51 - - - - $2,274 - $751
27,814
kWh
$481
51
kW-months/year
-
-
MMBtu
-
-
$
$2,274
-
$
08: 4.2120 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$5,184
Cost:
$9,200
$(-470) (-17,407) $(-146) (-15) - - $(-500) - $6,300 - $(-470)
(-17,407)
kWh
$(-146)
(-15)
kW-months/year
-
-
MMBtu
$(-500)
-
$
$6,300
-
$
TOTAL RECOMMENDED Savings:
$40,935
Cost:
$38,517
$4,332 160,446 $6,090 648 $22,439 2,471 $(-500) - $8,574 - $4,332
160,446
kWh
$6,090
648
kW-months/year
$22,439
2,471
MMBtu
$(-500)
-
$
$8,574
-
$
TOTAL IMPLEMENTED Savings:
$31,243
Cost:
$27,050
$3,461 128,175 $5,343 568 $22,439 2,471 - - - - $3,461
128,175
kWh
$5,343
568
kW-months/year
$22,439
2,471
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost