IAC logo
IAC Assessment: NC0227
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0227
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2001
Principal Product Casegood furniture
NAICS n/a
SIC 2511 - Wood Household Furniture
Sales $10,000,000-$50,000,000
# of Employees 563
Plant Area (Sq.Ft.) 750,000
Annual Production 320,000 Pieces
Production Hrs. Annual 2,500
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $631,080 14,883,952 kWh $0.04
Electricity Demand $198,212 55,059 kW-months/year $3.60
Electricity Fees $4,118 - $ -
Fuel Oil #6 $344,191 67,722 MMBtu $5.08
Coal $58,898 37,260 MMBtu $1.58
TOTAL ENERGY COSTS $1,236,499
RECOMMENDED SAVINGS* $685,205 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $299,069
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Other Liquid (haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Other Liquid (haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ gal $ $ $ $ $ $ $ $ $ $
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,391
Cost:
$250
$1,391 32,800 - - - - - - - - - - - - - - - - - - $1,391
32,800
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$15,815
Cost:
$30,000
$15,815 373,000 - - - - - - - - - - - - - - - - - - $15,815
373,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$662
Cost:
$308
- - - - $662 132 - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$662
132
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$89,586
Cost:
$60,000
- - - - - - $89,586 17,635 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$89,586
17,635
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$30,612
Cost:
$50,000
- - - - $14,105 3,250 $17,861 3,774 - - - - $(-1,354) - - - - - - - -
-
kWh
-
-
kW-months/year
$14,105
3,250
MMBtu
$17,861
3,774
MMBtu
-
-
gal
-
-
$
$(-1,354)
-
$
-
-
$
-
-
$
-
-
$
06: 2.2124 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK Savings:
$200,000
Cost:
$35,000
- - - - - - - - - - - - - - - - - - $200,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
$200,000
-
$
07: 2.1111 CONTROL PRESSURE ON STEAMER OPERATIONS Savings:
$7,356
Cost:
$7,500
- - - - - - $7,356 1,498 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,356
1,498
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$4,500
Cost:
$5,000
$5,088 120,000 $2,012 559 - - $(-2,600) 512 - - - - - - - - - - - - $5,088
120,000
kWh
$2,012
559
kW-months/year
-
-
MMBtu
$(-2,600)
512
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
09: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$17,577
Cost:
$15,000
- - - - $17,577 4,050 - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$17,577
4,050
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
10: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,636
Cost:
$4,205
$1,867 44,044 $769 214 - - - - - - - - - - - - - - - - $1,867
44,044
kWh
$769
214
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,277
Cost:
$2,690
$1,617 38,146 $660 183 - - - - - - - - - - - - - - - - $1,617
38,146
kWh
$660
183
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
12: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$824
Cost:
$1,210
$582 13,725 $242 67 - - - - - - - - - - - - - - - - $582
13,725
kWh
$242
67
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
13: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$8,933
Cost:
$10,067
- - - - - - - - $200 3,125 $(-1,667) - - - - - $10,400 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$200
3,125
gal
$(-1,667)
-
$
-
-
$
-
-
$
$10,400
-
$
-
-
$
14: 4.5120 CONDENSE OPERATION INTO ONE BUILDING Savings:
$279,320
Cost:
$500,000
$48,777 670,210 - - $36,543 8,420 - - - - $240,000 - $(-46,000) - - - - - - - $48,777
670,210
kWh
-
-
kW-months/year
$36,543
8,420
MMBtu
-
-
MMBtu
-
-
gal
$240,000
-
$
$(-46,000)
-
$
-
-
$
-
-
$
-
-
$
15: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$23,716
Cost:
$15,000
- - - - - - - - - - - - - - $23,716 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
$23,716
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$685,205
Cost:
$736,230
$75,137 1,291,925 $3,683 1,023 $68,887 15,852 $112,203 23,419 $200 3,125 $238,333 - $(-47,354) - $23,716 - $10,400 - $200,000 - $75,137
1,291,925
kWh
$3,683
1,023
kW-months/year
$68,887
15,852
MMBtu
$112,203
23,419
MMBtu
$200
3,125
gal
$238,333
-
$
$(-47,354)
-
$
$23,716
-
$
$10,400
-
$
$200,000
-
$
TOTAL IMPLEMENTED Savings:
$299,069
Cost:
$522,982
$51,226 727,979 $1,011 281 $36,543 8,420 $7,356 1,498 $200 3,125 $238,333 - $(-46,000) - - - $10,400 - - - $51,226
727,979
kWh
$1,011
281
kW-months/year
$36,543
8,420
MMBtu
$7,356
1,498
MMBtu
$200
3,125
gal
$238,333
-
$
$(-46,000)
-
$
-
-
$
$10,400
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ gal $ $ $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Other Liquid (haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Other Liquid (haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost One-time Revenue or Avoided Cost