IAC logo
IAC Assessment: NC0230
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0230
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2002
Principal Product Household textile goods
NAICS n/a
SIC 2392 - Housefurnishings, Nec
Sales $10,000,000-$50,000,000
# of Employees 145
Plant Area (Sq.Ft.) 130,000
Annual Production 1,200,000 Pounds
Production Hrs. Annual 2,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,506 1,666,800 kWh $0.05
Electricity Demand $36,206 7,404 kW-months/year $4.89
Electricity Fees $252 - $ -
Natural Gas $73,266 73,073 MMBtu $1.00
TOTAL ENERGY COSTS $186,230
RECOMMENDED SAVINGS* $32,701 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,096
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$22,396
Cost:
$5,000
- - $4,020 3,748 $26,376 - - - $(-8,000) - -
-
kWh
$4,020
3,748
kW-months/year
$26,376
-
$
-
-
MMBtu
$(-8,000)
-
$
02: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,099
Cost:
$1,354
$663 13,372 $436 89 - - - - - - $663
13,372
kWh
$436
89
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$893
Cost:
$500
- - - - - - $893 71 - - -
-
kWh
-
-
kW-months/year
-
-
$
$893
71
MMBtu
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,301
Cost:
$2,500
$1,058 21,340 $243 50 - - - - - - $1,058
21,340
kWh
$243
50
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$1,053
Cost:
$3,340
$661 13,340 $392 80 - - - - - - $661
13,340
kWh
$392
80
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$797
Cost:
$1,040
$501 10,098 $296 61 - - - - - - $501
10,098
kWh
$296
61
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$645
Cost:
$1,100
$296 5,973 $349 71 - - - - - - $296
5,973
kWh
$349
71
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$263
Cost:
-
- - - - - - $263 26 - - -
-
kWh
-
-
kW-months/year
-
-
$
$263
26
MMBtu
-
-
$
09: 2.1114 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE Savings:
$4,254
Cost:
$3,500
- - - - - - $4,254 424 - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,254
424
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$32,701
Cost:
$18,334
$3,179 64,123 $5,736 4,099 $26,376 - $5,410 521 $(-8,000) - $3,179
64,123
kWh
$5,736
4,099
kW-months/year
$26,376
-
$
$5,410
521
MMBtu
$(-8,000)
-
$
TOTAL IMPLEMENTED Savings:
$8,096
Cost:
$9,734
$1,825 36,810 $1,124 230 - - $5,147 495 - - $1,825
36,810
kWh
$1,124
230
kW-months/year
-
-
$
$5,147
495
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes