IAC logo
IAC Assessment: NC0297
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0297
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2004
Principal Product CV Joint Forging
NAICS 336350 - Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 92,000
Annual Production 13,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) nc
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $579,073 15,731,400 kWh $0.04
Electricity Demand $335,922 32,773 kW-months/year $10.25
Electricity Fees $32,064 - $ -
Natural Gas $142,450 18,474 MMBtu $7.71
TOTAL ENERGY COSTS $1,089,509
RECOMMENDED SAVINGS* $21,019 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,019
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$2,652
Cost:
$1,000
- - - - $2,652 344 - - -
-
kWh
-
-
kW-months/year
$2,652
344
MMBtu
-
-
$
02: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$1,635
Cost:
$800
- - - - $1,635 212 - - -
-
kWh
-
-
kW-months/year
$1,635
212
MMBtu
-
-
$
03: 2.2123 INSULATE FEEDWATER TANK Savings:
$547
Cost:
$1,500
- - - - $247 32 $300 - -
-
kWh
-
-
kW-months/year
$247
32
MMBtu
$300
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$13,319
Cost:
$1,950
$9,641 261,924 $3,678 359 - - - - $9,641
261,924
kWh
$3,678
359
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$846
Cost:
$1,400
$542 14,717 $206 20 - - $98 - $542
14,717
kWh
$206
20
kW-months/year
-
-
MMBtu
$98
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,920
Cost:
$4,114
$1,390 37,773 $530 52 - - - - $1,390
37,773
kWh
$530
52
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$100
Cost:
$130
$57 1,533 $43 4 - - - - $57
1,533
kWh
$43
4
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$21,019
Cost:
$10,894
$11,630 315,947 $4,457 435 $4,534 588 $398 - $11,630
315,947
kWh
$4,457
435
kW-months/year
$4,534
588
MMBtu
$398
-
$
TOTAL IMPLEMENTED Savings:
$21,019
Cost:
$10,894
$11,630 315,947 $4,457 435 $4,534 588 $398 - $11,630
315,947
kWh
$4,457
435
kW-months/year
$4,534
588
MMBtu
$398
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost