IAC logo
IAC Assessment: NC0304
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0304
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2004
Principal Product Blankets
NAICS 313210 - Broadwoven Fabric Mills
SIC 2392 - Housefurnishings, Nec
Sales $50,000,000-$100,000,000
# of Employees 500
Plant Area (Sq.Ft.) 400,000
Annual Production 12,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $484,336 17,887,754 kWh $0.03
Electricity Demand $338,965 322,282 kW-months/year $1.05
Electricity Fees $8,561 - $ -
Natural Gas $1,136,297 200,815 MMBtu $5.66
TOTAL ENERGY COSTS $1,968,159
RECOMMENDED SAVINGS* $83,903 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $55,055
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$25,824
Cost:
$24,000
$(-612) (-22,680) $(-340) (-32) $26,776 4,118 - - - - - - $(-612)
(-22,680)
kWh
$(-340)
(-32)
kW-months/year
$26,776
4,118
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.2127 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM Savings:
$27,494
Cost:
$13,050
- - - - $25,331 4,556 $1,082 360,576 - - $1,081 - -
-
kWh
-
-
kW-months/year
$25,331
4,556
MMBtu
$1,082
360,576
Tgal
-
-
$
$1,081
-
$
03: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$20,008
Cost:
$3,000
- - - - $20,008 3,719 - - - - - - -
-
kWh
-
-
kW-months/year
$20,008
3,719
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,821
Cost:
$400
$3,742 138,600 $2,079 198 - - - - - - - - $3,742
138,600
kWh
$2,079
198
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,732
Cost:
$100
$1,692 62,664 $940 90 - - - - $(-600) - $(-300) - $1,692
62,664
kWh
$940
90
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-600)
-
$
$(-300)
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,024
Cost:
$4,207
$1,944 72,000 $1,080 103 - - - - - - - - $1,944
72,000
kWh
$1,080
103
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$83,903
Cost:
$44,757
$6,766 250,584 $3,759 359 $72,115 12,393 $1,082 360,576 $(-600) - $781 - $6,766
250,584
kWh
$3,759
359
kW-months/year
$72,115
12,393
MMBtu
$1,082
360,576
Tgal
$(-600)
-
$
$781
-
$
TOTAL IMPLEMENTED Savings:
$55,055
Cost:
$16,550
$5,434 201,264 $3,019 288 $45,339 8,275 $1,082 360,576 $(-600) - $781 - $5,434
201,264
kWh
$3,019
288
kW-months/year
$45,339
8,275
MMBtu
$1,082
360,576
Tgal
$(-600)
-
$
$781
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost