IAC logo
IAC Assessment: NC0323
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0323
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2005
Principal Product Electronic data storage units
NAICS 334419 - Other Electronic Component Manufacturing
SIC 3670 -
Sales $100,000,000-$500,000,000
# of Employees 340
Plant Area (Sq.Ft.) 338,000
Annual Production 100,000 Pieces
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $630,281 18,188,925 kWh $0.03
Electricity Demand $285,871 33,921 kW-months/year $8.43
TOTAL ENERGY COSTS $916,152
RECOMMENDED SAVINGS* $185,573 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $118,032
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,020
Cost:
$3,726
$1,378 39,734 $642 84 - - $1,378
39,734
kWh
$642
84
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,893
Cost:
$50
$17,022 490,560 $5,611 672 $4,260 - $17,022
490,560
kWh
$5,611
672
kW-months/year
$4,260
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$87,704
Cost:
$291,200
$65,962 1,900,920 $21,742 2,604 - - $65,962
1,900,920
kWh
$21,742
2,604
kW-months/year
-
-
$
04: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$8,095
Cost:
-
$5,653 162,908 $2,442 282 - - $5,653
162,908
kWh
$2,442
282
kW-months/year
-
-
$
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$30,533
Cost:
-
$30,533 983,040 - - - - $30,533
983,040
kWh
-
-
kW-months/year
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$16,545
Cost:
$10,648
$16,545 532,703 - - - - $16,545
532,703
kWh
-
-
kW-months/year
-
-
$
07: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$13,783
Cost:
$150
$11,544 332,693 $2,239 244 - - $11,544
332,693
kWh
$2,239
244
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$185,573
Cost:
$305,774
$148,637 4,442,558 $32,676 3,886 $4,260 - $148,637
4,442,558
kWh
$32,676
3,886
kW-months/year
$4,260
-
$
TOTAL IMPLEMENTED Savings:
$118,032
Cost:
$301,998
$94,051 2,766,316 $23,981 2,848 - - $94,051
2,766,316
kWh
$23,981
2,848
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost