IAC Assessment: NC0325
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0325
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2005
Principal Product Dyed yarn
NAICS 313210 - Broadwoven Fabric Mills
SIC 2211 - Broadwoven Fabric Mills, Cotton
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 150,000
Annual Production 7,500,000 Pounds
Production Hrs. Annual 8,600
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $358,166 21,306,698 kWh $0.02
Electricity Demand $283,024 33,935 kW-months/year $8.34
Coal $2,000,000 783,167 MMBtu $2.55
TOTAL ENERGY COSTS $2,641,190
RECOMMENDED SAVINGS* $266,878 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Coal Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Coal Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$27,917
Cost:
$25,000
- - - - $16,467 4,722 $11,450 3,480,000 - - - - -
-
kWh
-
-
kW-months/year
$16,467
4,722
MMBtu
$11,450
3,480,000
Tgal
-
-
$
-
-
$
02: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$222,508
Cost:
$100,000
- - - - $222,508 63,756 - - - - - - -
-
kWh
-
-
kW-months/year
$222,508
63,756
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$9,902
Cost:
$18,198
- - - - $9,902 2,837 - - - - - - -
-
kWh
-
-
kW-months/year
$9,902
2,837
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$423
Cost:
$1,006
$246 14,612 $177 21 - - - - - - - - $246
14,612
kWh
$177
21
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,395
Cost:
$2,000
$1,425 84,753 $970 116 - - - - - - - - $1,425
84,753
kWh
$970
116
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,733
Cost:
$7,500
$810 48,180 $550 66 - - - - $2,099 - $274 - $810
48,180
kWh
$550
66
kW-months/year
-
-
MMBtu
-
-
Tgal
$2,099
-
$
$274
-
$
TOTAL RECOMMENDED Savings:
$266,878
Cost:
$153,704
$2,481 147,545 $1,697 203 $248,877 71,315 $11,450 3,480,000 $2,099 - $274 - $2,481
147,545
kWh
$1,697
203
kW-months/year
$248,877
71,315
MMBtu
$11,450
3,480,000
Tgal
$2,099
-
$
$274
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Coal Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Coal Water Disposal Personnel Changes Ancillary Material Cost