IAC Assessment: NC0332
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0332
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2006
Principal Product Pharmaceutical preparations
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 51,200
Annual Production 2,000,000 Pieces
Production Hrs. Annual 2,500
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,358 4,555,800 kWh $0.03
Electricity Demand $202,835 17,766 kW-months/year $11.42
Electricity Fees $11,602 - $ -
Natural Gas $267,513 20,557 MMBtu $13.01
TOTAL ENERGY COSTS $608,308
RECOMMENDED SAVINGS* $78,410 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Electricity Usage Electricity Demand Natural Gas Fuel Oil #2
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$20,455
Cost:
$12,000
$387 14,400 $22,878 1,800 - - $(-2,810) (-197) $387
14,400
kWh
$22,878
1,800
kW-months/year
-
-
MMBtu
$(-2,810)
(-197)
MMBtu
02: 2.3113 MAKE ICE DURING OFF PEAK HOURS FOR COOLING Savings:
$39,950
Cost:
$210,000
- - $39,950 3,141 - - - - -
-
kWh
$39,950
3,141
kW-months/year
-
-
MMBtu
-
-
MMBtu
03: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$17,210
Cost:
$28,200
$(-1,277) (-47,533) $(-69) (-4) $18,556 1,426 - - $(-1,277)
(-47,533)
kWh
$(-69)
(-4)
kW-months/year
$18,556
1,426
MMBtu
-
-
MMBtu
04: 2.2123 INSULATE FEEDWATER TANK Savings:
$389
Cost:
$277
- - - - $389 30 - - -
-
kWh
-
-
kW-months/year
$389
30
MMBtu
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$406
Cost:
$86
$208 7,750 $198 12 - - - - $208
7,750
kWh
$198
12
kW-months/year
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$78,410
Cost:
$250,563
$(-682) (-25,383) $62,957 4,949 $18,945 1,456 $(-2,810) (-197) $(-682)
(-25,383)
kWh
$62,957
4,949
kW-months/year
$18,945
1,456
MMBtu
$(-2,810)
(-197)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Electricity Usage Electricity Demand Natural Gas Fuel Oil #2