IAC Assessment: NC0336
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0336
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2006
Principal Product plumbing fixtures
NAICS 332913 - Plumbing Fixture Fitting and Trim Manufacturing
SIC 3432 - Plumbing Fixture Fittings And Trim
Sales $50,000,000-$100,000,000
# of Employees 230
Plant Area (Sq.Ft.) 155,000
Annual Production 350,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $423,742 9,778,000 kWh $0.04
Electricity Demand $108,137 25,444 kW-months/year $4.25
Electricity Fees $202 - $ -
Natural Gas $147,027 14,678 MMBtu $10.02
TOTAL ENERGY COSTS $679,108
RECOMMENDED SAVINGS* $166,851 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,616
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$13,979
Cost:
$24,586
$(-249) (-5,968) $(-51) (-12) $14,279 1,425 - - - - - - $(-249)
(-5,968)
kWh
$(-51)
(-12)
kW-months/year
$14,279
1,425
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
02: 3.4112 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER Savings:
$8,595
Cost:
$1,300
- - - - - - $5,685 - $2,910 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,685
-
Tgal
$2,910
-
$
-
-
Tgal
03: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$2,620
Cost:
$1,500
- - - - $2,620 261 - - - - - - -
-
kWh
-
-
kW-months/year
$2,620
261
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$9,620
Cost:
$20,000
- - - - $9,620 - - - - - - - -
-
kWh
-
-
kW-months/year
$9,620
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
05: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$12,198
Cost:
$7,290
- - - - $8,076 806 - - $2,273 - $1,849 - -
-
kWh
-
-
kW-months/year
$8,076
806
MMBtu
-
-
Tgal
$2,273
-
$
$1,849
-
Tgal
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,156
Cost:
$455
- - - - $2,156 215 - - - - - - -
-
kWh
-
-
kW-months/year
$2,156
215
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
07: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$11,658
Cost:
$6,500
$10,808 241,208 $850 200 - - - - - - - - $10,808
241,208
kWh
$850
200
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
08: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$18,883
Cost:
$20,000
$18,883 451,866 - - - - - - - - - - $18,883
451,866
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,535
Cost:
$100
$2,938 70,304 $597 140 - - - - - - - - $2,938
70,304
kWh
$597
140
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,046
Cost:
$1,735
$870 20,818 $176 42 - - - - - - - - $870
20,818
kWh
$176
42
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,361
Cost:
$50
$2,337 55,920 $475 112 - - - - $549 - - - $2,337
55,920
kWh
$475
112
kW-months/year
-
-
MMBtu
-
-
Tgal
$549
-
$
-
-
Tgal
12: 4.311 SCHEDULE DELIVERIES ACCORDING TO DEMAND Savings:
$79,200
Cost:
$25,000
- - - - - - - - $79,200 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$79,200
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$166,851
Cost:
$108,516
$35,587 834,148 $2,047 482 $36,751 2,707 $5,685 - $84,932 - $1,849 - $35,587
834,148
kWh
$2,047
482
kW-months/year
$36,751
2,707
MMBtu
$5,685
-
Tgal
$84,932
-
$
$1,849
-
Tgal
TOTAL IMPLEMENTED Savings:
$34,616
Cost:
$27,390
$21,821 522,170 $597 140 $8,076 806 - - $2,273 - $1,849 - $21,821
522,170
kWh
$597
140
kW-months/year
$8,076
806
MMBtu
-
-
Tgal
$2,273
-
$
$1,849
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Water Consumption