Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2006 |
Principal Product | Beer |
NAICS | 312120 - Breweries |
SIC | 2082 - Malt Beverages |
Sales | $100,000,000-$500,000,000 |
# of Employees | 480 |
Plant Area (Sq.Ft.) | 1,000,000 |
Annual Production | 175,000 Thousand Gallons |
Production Hrs. Annual | 8,400 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,589,203 | 39,730,080 | kWh | $0.04 |
Electricity Demand | $1,083,888 | 62,544 | kW-months/year | $17.33 |
Natural Gas | $2,072,709 | 230,301 | MMBtu | $9.00 |
TOTAL ENERGY COSTS | $4,745,800 | |||
RECOMMENDED SAVINGS* | $1,394,693 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $526,208 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER |
Savings: $789,735 Cost: $918,265 |
$(-14,888) | (-372,198) | $(-9,670) | (-558) | $814,293 | 90,477 |
$(-14,888) (-372,198) kWh |
$(-9,670) (-558) kW-months/year |
$814,293 90,477 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL |
Savings: $460,800 Cost: $118,971 |
- | - | - | - | $460,800 | 51,200 |
- - kWh |
- - kW-months/year |
$460,800 51,200 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $48,795 Cost: $35,000 |
- | - | - | - | $48,795 | 5,422 |
- - kWh |
- - kW-months/year |
$48,795 5,422 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7263 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION |
Savings: $62,722 Cost: $50,000 |
$38,016 | 950,400 | $24,706 | 1,426 | - | - |
$38,016 950,400 kWh |
$24,706 1,426 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $29,955 Cost: $5,000 |
$18,240 | 456,000 | $11,715 | 676 | - | - |
$18,240 456,000 kWh |
$11,715 676 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,686 Cost: $4,423 |
$1,659 | 41,472 | $1,027 | 59 | - | - |
$1,659 41,472 kWh |
$1,027 59 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,394,693 Cost: $1,131,659 |
$43,027 | 1,075,674 | $27,778 | 1,603 | $1,323,888 | 147,099 | $43,027 1,075,674 kWh |
$27,778 1,603 kW-months/year |
$1,323,888 147,099 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $526,208 Cost: $173,394 |
$39,675 | 991,872 | $25,733 | 1,485 | $460,800 | 51,200 | $39,675 991,872 kWh |
$25,733 1,485 kW-months/year |
$460,800 51,200 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |