Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2007 |
Principal Product | Fuel controls |
NAICS | 336412 - Aircraft Engine and Engine Parts Manufacturing |
SIC | 3724 - Aircraft Engines And Engine Parts |
Sales | $100,000,000-$500,000,000 |
# of Employees | 335 |
Plant Area (Sq.Ft.) | 220,000 |
Annual Production | 7,500 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,189,598 | 20,904,663 | kWh | $0.06 |
Electricity Demand | $79,470 | 48,074 | kW-months/year | $1.65 |
Electricity Fees | $3,994 | - | $ | - |
Natural Gas | $403,562 | 22,709 | MMBtu | $17.77 |
TOTAL ENERGY COSTS | $1,676,624 | |||
RECOMMENDED SAVINGS* | $189,132 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,722 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION |
Savings: $39,874 Cost: $45,600 |
$39,874 | 700,774 | - | - | - | - | - | - |
$39,874 700,774 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $32,774 Cost: $100,000 |
$32,774 | 576,000 | - | - | - | - | - | - |
$32,774 576,000 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $65,972 Cost: $100,000 |
$(-17,028) | (-251,896) | $83,000 | 4,558 | - | - | - | - |
$(-17,028) (-251,896) kWh |
$83,000 4,558 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $35,076 Cost: $2,000 |
$35,076 | - | - | - | - | - | - | - |
$35,076 - kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,375 Cost: $100 |
$4,775 | 83,925 | - | - | $(-1,200) | - | $(-1,200) | - |
$4,775 83,925 kWh |
- - MMBtu |
$(-1,200) - $ |
$(-1,200) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION |
Savings: $7,411 Cost: $2,000 |
- | - | $7,411 | 407 | - | - | - | - |
- - kWh |
$7,411 407 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $2,714 Cost: $1,000 |
- | - | $2,714 | 149 | - | - | - | - |
- - kWh |
$2,714 149 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,936 Cost: $2,559 |
$2,936 | 51,593 | - | - | - | - | - | - |
$2,936 51,593 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $189,132 Cost: $253,259 |
$98,407 | 1,160,396 | $93,125 | 5,114 | $(-1,200) | - | $(-1,200) | - | $98,407 1,160,396 kWh |
$93,125 5,114 MMBtu |
$(-1,200) - $ |
$(-1,200) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,722 Cost: $4,659 |
$7,711 | 135,518 | $7,411 | 407 | $(-1,200) | - | $(-1,200) | - | $7,711 135,518 kWh |
$7,411 407 MMBtu |
$(-1,200) - $ |
$(-1,200) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Personnel Changes | Ancillary Material Cost |