IAC Assessment: NC0354
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2007
Principal Product Fuel controls
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $100,000,000-$500,000,000
# of Employees 335
Plant Area (Sq.Ft.) 220,000
Annual Production 7,500 Pieces
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,189,598 20,904,663 kWh $0.06
Electricity Demand $79,470 48,074 kW-months/year $1.65
Electricity Fees $3,994 - $ -
Natural Gas $403,562 22,709 MMBtu $17.77
TOTAL ENERGY COSTS $1,676,624
RECOMMENDED SAVINGS* $189,132 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,722
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $
01: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$39,874
Cost:
$45,600
$39,874 700,774 - - - - - - $39,874
700,774
kWh
-
-
MMBtu
-
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$32,774
Cost:
$100,000
$32,774 576,000 - - - - - - $32,774
576,000
kWh
-
-
MMBtu
-
-
$
-
-
$
03: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$65,972
Cost:
$100,000
$(-17,028) (-251,896) $83,000 4,558 - - - - $(-17,028)
(-251,896)
kWh
$83,000
4,558
MMBtu
-
-
$
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$35,076
Cost:
$2,000
$35,076 - - - - - - - $35,076
-
kWh
-
-
MMBtu
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,375
Cost:
$100
$4,775 83,925 - - $(-1,200) - $(-1,200) - $4,775
83,925
kWh
-
-
MMBtu
$(-1,200)
-
$
$(-1,200)
-
$
06: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$7,411
Cost:
$2,000
- - $7,411 407 - - - - -
-
kWh
$7,411
407
MMBtu
-
-
$
-
-
$
07: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$2,714
Cost:
$1,000
- - $2,714 149 - - - - -
-
kWh
$2,714
149
MMBtu
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,936
Cost:
$2,559
$2,936 51,593 - - - - - - $2,936
51,593
kWh
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$189,132
Cost:
$253,259
$98,407 1,160,396 $93,125 5,114 $(-1,200) - $(-1,200) - $98,407
1,160,396
kWh
$93,125
5,114
MMBtu
$(-1,200)
-
$
$(-1,200)
-
$
TOTAL IMPLEMENTED Savings:
$12,722
Cost:
$4,659
$7,711 135,518 $7,411 407 $(-1,200) - $(-1,200) - $7,711
135,518
kWh
$7,411
407
MMBtu
$(-1,200)
-
$
$(-1,200)
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost