IAC Assessment: NC0386
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0386
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2009
Principal Product Toothpaste tubes
NAICS 332439 - Other Metal Container Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $500,000-$1,000,000
# of Employees 203
Plant Area (Sq.Ft.) 40,000
Annual Production 700,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $266,875 7,743,000 kWh $0.03
Electricity Demand $178,111 14,020 kW-months/year $12.70
Natural Gas $24,580 1,701 MMBtu $14.45
TOTAL ENERGY COSTS $469,566
RECOMMENDED SAVINGS* $79,067 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$31,742
Cost:
$49,000
$17,010 384,525 $14,732 1,281 - - - - - - $17,010
384,525
kWh
$14,732
1,281
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,160
Cost:
-
$4,491 101,530 $1,669 145 - - - - - - $4,491
101,530
kWh
$1,669
145
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$9,621
Cost:
$3,300
- - - - $9,621 628 - - - - -
-
kWh
-
-
kW-months/year
$9,621
628
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,236
Cost:
$100
$3,673 83,030 $1,363 119 - - $(-1,200) - $(-600) - $3,673
83,030
kWh
$1,363
119
kW-months/year
-
-
MMBtu
$(-1,200)
-
$
$(-600)
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,916
Cost:
$2,848
$2,127 48,081 $789 68 - - - - - - $2,127
48,081
kWh
$789
68
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,520
Cost:
-
- - $1,520 132 - - - - - - -
-
kWh
$1,520
132
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,493
Cost:
$6,490
$2,549 57,614 $944 82 - - - - - - $2,549
57,614
kWh
$944
82
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,405
Cost:
$32,776
$11,927 269,606 $4,429 385 - - - - $(-2,951) - $11,927
269,606
kWh
$4,429
385
kW-months/year
-
-
MMBtu
-
-
$
$(-2,951)
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,974
Cost:
$8,400
$6,974 157,651 - - - - - - - - $6,974
157,651
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$79,067
Cost:
$102,914
$48,751 1,102,037 $25,446 2,212 $9,621 628 $(-1,200) - $(-3,551) - $48,751
1,102,037
kWh
$25,446
2,212
kW-months/year
$9,621
628
MMBtu
$(-1,200)
-
$
$(-3,551)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost