Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2009 |
Principal Product | Toothpaste tubes |
NAICS | 332439 - Other Metal Container Manufacturing |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $500,000-$1,000,000 |
# of Employees | 203 |
Plant Area (Sq.Ft.) | 40,000 |
Annual Production | 700,000,000 Pieces |
Production Hrs. Annual | 8,400 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $266,875 | 7,743,000 | kWh | $0.03 |
Electricity Demand | $178,111 | 14,020 | kW-months/year | $12.70 |
Natural Gas | $24,580 | 1,701 | MMBtu | $14.45 |
TOTAL ENERGY COSTS | $469,566 | |||
RECOMMENDED SAVINGS* | $79,067 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $31,742 Cost: $49,000 |
$17,010 | 384,525 | $14,732 | 1,281 | - | - | - | - | - | - |
$17,010 384,525 kWh |
$14,732 1,281 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $6,160 Cost: - |
$4,491 | 101,530 | $1,669 | 145 | - | - | - | - | - | - |
$4,491 101,530 kWh |
$1,669 145 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $9,621 Cost: $3,300 |
- | - | - | - | $9,621 | 628 | - | - | - | - |
- - kWh |
- - kW-months/year |
$9,621 628 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,236 Cost: $100 |
$3,673 | 83,030 | $1,363 | 119 | - | - | $(-1,200) | - | $(-600) | - |
$3,673 83,030 kWh |
$1,363 119 kW-months/year |
- - MMBtu |
$(-1,200) - $ |
$(-600) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $2,916 Cost: $2,848 |
$2,127 | 48,081 | $789 | 68 | - | - | - | - | - | - |
$2,127 48,081 kWh |
$789 68 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $1,520 Cost: - |
- | - | $1,520 | 132 | - | - | - | - | - | - |
- - kWh |
$1,520 132 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,493 Cost: $6,490 |
$2,549 | 57,614 | $944 | 82 | - | - | - | - | - | - |
$2,549 57,614 kWh |
$944 82 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $13,405 Cost: $32,776 |
$11,927 | 269,606 | $4,429 | 385 | - | - | - | - | $(-2,951) | - |
$11,927 269,606 kWh |
$4,429 385 kW-months/year |
- - MMBtu |
- - $ |
$(-2,951) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $6,974 Cost: $8,400 |
$6,974 | 157,651 | - | - | - | - | - | - | - | - |
$6,974 157,651 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $79,067 Cost: $102,914 |
$48,751 | 1,102,037 | $25,446 | 2,212 | $9,621 | 628 | $(-1,200) | - | $(-3,551) | - | $48,751 1,102,037 kWh |
$25,446 2,212 kW-months/year |
$9,621 628 MMBtu |
$(-1,200) - $ |
$(-3,551) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |