IAC Assessment: NC0442
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0442
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2012
Principal Product Railroad ties
NAICS 321114 - Wood Preservation
SIC 2491 - Wood Preserving
Sales $10,000,000-$50,000,000
# of Employees 59
Plant Area (Sq.Ft.) 52,000
Annual Production 3,283,000 Thousand Feet
Production Hrs. Annual 8,400
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $150,546 3,826,800 kWh $0.04
Electricity Demand $92,342 9,063 kW-months/year $10.19
Wood $232,273 91,583 MMBtu $2.54
Other Energy $1 39,250 MMBtu $0.00
TOTAL ENERGY COSTS $475,162
RECOMMENDED SAVINGS* $70,795 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,863
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Wood Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$9,357
Cost:
$35,000
- - - - $9,281 3,654 $76 25,200 - - - - -
-
kWh
-
-
kW-months/year
$9,281
3,654
MMBtu
$76
25,200
Tgal
-
-
$
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$44,787
Cost:
$200,000
- - - - $44,787 17,633 - - - - - - -
-
kWh
-
-
kW-months/year
$44,787
17,633
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.2127 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM Savings:
$4,788
Cost:
$20,000
- - - - $4,788 1,885 - - - - - - -
-
kWh
-
-
kW-months/year
$4,788
1,885
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,196
Cost:
$4,425
$1,606 40,827 $590 58 - - - - - - - - $1,606
40,827
kWh
$590
58
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,045
Cost:
$6,067
$1,985 50,466 $1,060 104 - - - - - - - - $1,985
50,466
kWh
$1,060
104
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,418
Cost:
$9,330
$3,224 81,959 $1,194 118 - - - - - - - - $3,224
81,959
kWh
$1,194
118
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$977
Cost:
$231
$713 18,129 $264 26 - - - - - - - - $713
18,129
kWh
$264
26
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,227
Cost:
$300
$1,508 38,338 $559 55 - - - - $(-600) - $(-240) - $1,508
38,338
kWh
$559
55
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-600)
-
$
$(-240)
-
$
TOTAL RECOMMENDED Savings:
$70,795
Cost:
$275,353
$9,036 229,719 $3,667 361 $58,856 23,172 $76 25,200 $(-600) - $(-240) - $9,036
229,719
kWh
$3,667
361
kW-months/year
$58,856
23,172
MMBtu
$76
25,200
Tgal
$(-600)
-
$
$(-240)
-
$
TOTAL IMPLEMENTED Savings:
$11,863
Cost:
$20,353
$9,036 229,719 $3,667 361 - - - - $(-600) - $(-240) - $9,036
229,719
kWh
$3,667
361
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-600)
-
$
$(-240)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Wood Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Wood Water Disposal Personnel Changes Ancillary Material Cost