IAC logo
IAC Assessment: NC0464
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0464
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2012
Principal Product Shampoos and deodorants
NAICS 325620 - Toilet Preparation Manufacturing
SIC 2844 - Toilet Preparations
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 550,000
Annual Production 0 Units
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,154,357 19,940,560 kWh $0.06
Electricity Demand $1,373,289 164,269 kW-months/year $8.36
Natural Gas $175,479 33,922 MMBtu $5.17
TOTAL ENERGY COSTS $2,703,125
RECOMMENDED SAVINGS* $140,111 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $95,008
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$87,056
Cost:
$77,718
$73,553 1,143,198 $13,092 1,566 - - $411 - $73,553
1,143,198
kWh
$13,092
1,566
kW-months/year
-
-
$
$411
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,873
Cost:
$35,445
$5,453 84,751 $2,420 289 - - - - $5,453
84,751
kWh
$2,420
289
kW-months/year
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$79
Cost:
$110
$10 160 $62 7 - - $7 - $10
160
kWh
$62
7
kW-months/year
-
-
$
$7
-
$
04: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$42,271
Cost:
$58,000
$42,271 657,000 - - - - - - $42,271
657,000
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.5194 REDESIGN PROCESS Savings:
$2,832
Cost:
$1,000
$4,822 74,952 $843 101 $(-2,833) - - - $4,822
74,952
kWh
$843
101
kW-months/year
$(-2,833)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$140,111
Cost:
$172,273
$126,109 1,960,061 $16,417 1,963 $(-2,833) - $418 - $126,109
1,960,061
kWh
$16,417
1,963
kW-months/year
$(-2,833)
-
$
$418
-
$
TOTAL IMPLEMENTED Savings:
$95,008
Cost:
$113,273
$79,016 1,228,109 $15,574 1,862 - - $418 - $79,016
1,228,109
kWh
$15,574
1,862
kW-months/year
-
-
$
$418
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost