Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2014 |
Principal Product | Gas cylinders |
NAICS | 332420 - Metal Tank (Heavy Gauge) Manufacturing |
SIC | 3443 - Fabricated Plate Work (boiler Shops) |
Sales | $10,000,000-$50,000,000 |
# of Employees | 104 |
Plant Area (Sq.Ft.) | 120,000 |
Annual Production | 1,000,000 Pieces |
Production Hrs. Annual | 8,712 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $487,864 | 8,144,678 | kWh | $0.06 |
Electricity Demand | $72,366 | 17,144 | kW-months/year | $4.22 |
Electricity Fees | $2,634 | - | $ | - |
Natural Gas | $269,330 | 45,834 | MMBtu | $5.88 |
TOTAL ENERGY COSTS | $832,194 | |||
RECOMMENDED SAVINGS* | $61,403 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $38,469 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $23,503 Cost: $100 |
$143,154 | - | $(-120,627) | - | $976 | - | - | - | - | - | - | - |
$143,154 - kWh |
$(-120,627) - kW-months/year |
$976 - $ |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $13,824 Cost: $50,000 |
$2,670 | 44,867 | $570 | 124 | - | - | $10,584 | 1,800 | - | - | - | - |
$2,670 44,867 kWh |
$570 124 kW-months/year |
- - $ |
$10,584 1,800 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $4,388 Cost: $5,250 |
- | - | - | - | - | - | $4,388 | 746 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$4,388 746 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $3,509 Cost: $10,000 |
$5,339 | 89,734 | $571 | 124 | - | - | $(-2,401) | (-408) | - | - | - | - |
$5,339 89,734 kWh |
$571 124 kW-months/year |
- - $ |
$(-2,401) (-408) MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,436 Cost: $50 |
$3,105 | 52,209 | $331 | 71 | - | - | - | - | - | - | - | - |
$3,105 52,209 kWh |
$331 71 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,983 Cost: $100 |
$5,530 | 92,938 | $593 | 128 | - | - | - | - | $(-900) | - | $(-240) | - |
$5,530 92,938 kWh |
$593 128 kW-months/year |
- - $ |
- - MMBtu |
$(-900) - $ |
$(-240) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,002 Cost: $7,540 |
$1,873 | 23,418 | $129 | 31 | - | - | - | - | - | - | - | - |
$1,873 23,418 kWh |
$129 31 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $3,435 Cost: $868 |
$3,435 | 42,933 | - | - | - | - | - | - | - | - | - | - |
$3,435 42,933 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING |
Savings: $1,213 Cost: $1,017 |
$1,061 | 17,840 | $152 | 33 | - | - | - | - | - | - | - | - |
$1,061 17,840 kWh |
$152 33 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $1,110 Cost: $200 |
$508 | - | $602 | 62 | - | - | - | - | - | - | - | - |
$508 - kWh |
$602 62 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $61,403 Cost: $75,125 |
$166,675 | 363,939 | $(-117,679) | 573 | $976 | - | $12,571 | 2,138 | $(-900) | - | $(-240) | - | $166,675 363,939 kWh |
$(-117,679) 573 kW-months/year |
$976 - $ |
$12,571 2,138 MMBtu |
$(-900) - $ |
$(-240) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $38,469 Cost: $8,858 |
$157,605 | 211,498 | $(-118,972) | 292 | $976 | - | - | - | $(-900) | - | $(-240) | - | $157,605 211,498 kWh |
$(-118,972) 292 kW-months/year |
$976 - $ |
- - MMBtu |
$(-900) - $ |
$(-240) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost |