Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2014 |
Principal Product | HVAC compressors |
NAICS | 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585 - Refrigeration And Heating Equipment |
Sales | $100,000,000-$500,000,000 |
# of Employees | 500 |
Plant Area (Sq.Ft.) | 800,000 |
Annual Production | 1,500,000 Pieces |
Production Hrs. Annual | 4,000 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,816,948 | 44,467,783 | kWh | $0.04 |
Electricity Demand | $1,321,382 | 100,718 | kW-months/year | $13.12 |
Natural Gas | $523,564 | 114,230 | MMBtu | $4.58 |
TOTAL ENERGY COSTS | $3,661,894 | |||
RECOMMENDED SAVINGS* | $64,447 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $57,106 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,264 Cost: $42,866 |
$7,494 | 182,784 | $7,195 | 548 | - | - | - | - | $(-425) | - |
$7,494 182,784 kWh |
$7,195 548 kW-months/year |
- - MMBtu |
- - $ |
$(-425) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $19,056 Cost: $100 |
$9,723 | 237,137 | $9,333 | 711 | - | - | - | - | - | - |
$9,723 237,137 kWh |
$9,333 711 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $10,368 Cost: $100 |
$6,515 | 158,898 | $6,253 | 477 | - | - | $(-1,200) | - | $(-1,200) | - |
$6,515 158,898 kWh |
$6,253 477 kW-months/year |
- - MMBtu |
$(-1,200) - $ |
$(-1,200) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $7,341 Cost: $29,000 |
$7,341 | 179,040 | - | - | - | - | - | - | - | - |
$7,341 179,040 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $606 Cost: $300 |
$309 | 7,540 | $297 | 23 | - | - | - | - | - | - |
$309 7,540 kWh |
$297 23 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $3,243 Cost: $475 |
$1,432 | 34,920 | $1,375 | 105 | - | - | - | - | $436 | - |
$1,432 34,920 kWh |
$1,375 105 kW-months/year |
- - MMBtu |
- - $ |
$436 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,355 Cost: $3,984 |
$1,201 | 29,304 | $1,154 | 88 | - | - | - | - | - | - |
$1,201 29,304 kWh |
$1,154 88 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,948 Cost: $3,644 |
$1,948 | 47,504 | - | - | - | - | - | - | - | - |
$1,948 47,504 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $550 Cost: $160 |
$175 | 4,275 | $77 | 6 | - | - | - | - | $298 | - |
$175 4,275 kWh |
$77 6 kW-months/year |
- - MMBtu |
- - $ |
$298 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $54 Cost: $40 |
$54 | 1,320 | - | - | - | - | - | - | - | - |
$54 1,320 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $1,126 Cost: $1,050 |
- | - | - | - | $1,126 | 264 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,126 264 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $2,718 Cost: $8,146 |
$1,382 | 33,944 | $1,336 | 102 | - | - | - | - | - | - |
$1,382 33,944 kWh |
$1,336 102 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $818 Cost: $180 |
$417 | 10,174 | $401 | 30 | - | - | - | - | - | - |
$417 10,174 kWh |
$401 30 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $64,447 Cost: $90,045 |
$37,991 | 926,840 | $27,421 | 2,090 | $1,126 | 264 | $(-1,200) | - | $(-891) | - | $37,991 926,840 kWh |
$27,421 2,090 kW-months/year |
$1,126 264 MMBtu |
$(-1,200) - $ |
$(-891) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $57,106 Cost: $61,045 |
$30,650 | 747,800 | $27,421 | 2,090 | $1,126 | 264 | $(-1,200) | - | $(-891) | - | $30,650 747,800 kWh |
$27,421 2,090 kW-months/year |
$1,126 264 MMBtu |
$(-1,200) - $ |
$(-891) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||