IAC logo
IAC Assessment: NC0528
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0528
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2014
Principal Product Motors
NAICS 335312 - Motor and Generator Manufacturing
SIC 3621 - Motors And Generators
Sales $100,000,000-$500,000,000
# of Employees 462
Plant Area (Sq.Ft.) 259,000
Annual Production 1,280 Pieces
Production Hrs. Annual 8,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $560,939 13,864,800 kWh $0.04
Electricity Demand $288,076 25,721 kW-months/year $11.20
Electricity Fees $703 - $ -
Natural Gas $385,353 51,988 MMBtu $7.41
TOTAL ENERGY COSTS $1,235,071
RECOMMENDED SAVINGS* $19,476 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,362
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,097
Cost:
$100
$4,759 117,495 $1,878 168 $(-300) - $(-240) - $4,759
117,495
kWh
$1,878
168
kW-months/year
$(-300)
-
$
$(-240)
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,526
Cost:
$100
$3,245 80,113 $1,281 114 - - - - $3,245
80,113
kWh
$1,281
114
kW-months/year
-
-
$
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,799
Cost:
$150
$495 12,219 $1,304 116 - - - - $495
12,219
kWh
$1,304
116
kW-months/year
-
-
$
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,209
Cost:
$1,935
$2,300 56,800 $909 81 - - - - $2,300
56,800
kWh
$909
81
kW-months/year
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$917
Cost:
$650
$917 22,638 - - - - - - $917
22,638
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$612
Cost:
$754
$404 9,979 $160 14 - - $48 - $404
9,979
kWh
$160
14
kW-months/year
-
-
$
$48
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$726
Cost:
$224
$232 5,739 $92 8 - - $402 - $232
5,739
kWh
$92
8
kW-months/year
-
-
$
$402
-
$
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$471
Cost:
$275
$306 7,557 $122 11 - - $43 - $306
7,557
kWh
$122
11
kW-months/year
-
-
$
$43
-
$
09: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,119
Cost:
$100
$245 - $874 87 - - - - $245
-
kWh
$874
87
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$19,476
Cost:
$4,288
$12,903 312,540 $6,620 599 $(-300) - $253 - $12,903
312,540
kWh
$6,620
599
kW-months/year
$(-300)
-
$
$253
-
$
TOTAL IMPLEMENTED Savings:
$17,362
Cost:
$3,139
$11,448 276,606 $6,406 580 $(-300) - $(-192) - $11,448
276,606
kWh
$6,406
580
kW-months/year
$(-300)
-
$
$(-192)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost