IAC logo
IAC Assessment: NC0534
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0534
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2015
Principal Product Mobile homes
NAICS 321991 - Manufactured Home (Mobile Home) Manufacturing
SIC 2451 - Mobile Homes
Sales $10,000,000-$50,000,000
# of Employees 192
Plant Area (Sq.Ft.) 240,000
Annual Production 1,264 Pieces
Production Hrs. Annual 2,125
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $167,760 2,796,000 kWh $0.06
Electricity Demand $30,991 6,708 kW-months/year $4.62
Electricity Fees $5,802 - $ -
LPG $33,137 1,511 MMBtu $21.93
TOTAL ENERGY COSTS $237,690
RECOMMENDED SAVINGS* $32,450 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,768
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$2,606
Cost:
$2,200
- - - - - - $2,606 119 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,606
119
MMBtu
-
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,491
Cost:
$20,000
- - - - - - $6,491 296 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,491
296
MMBtu
-
-
$
-
-
$
03: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$20,292
Cost:
$100,000
- - - - $(-12,845) (-1,511) $33,137 1,511 - - - - -
-
kWh
-
-
kW-months/year
$(-12,845)
(-1,511)
MMBtu
$33,137
1,511
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$349
Cost:
$96
$154 2,565 $16 4 - - - - - - $179 - $154
2,565
kWh
$16
4
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$179
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$402
Cost:
$1,455
$280 4,667 $122 26 - - - - - - - - $280
4,667
kWh
$122
26
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,202
Cost:
$5,000
$837 13,959 $365 79 - - - - - - - - $837
13,959
kWh
$365
79
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$411
Cost:
$100
$468 7,799 $203 44 - - - - $(-200) - $(-60) - $468
7,799
kWh
$203
44
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-200)
-
$
$(-60)
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$697
Cost:
$2,500
$486 8,096 $211 46 - - - - - - - - $486
8,096
kWh
$211
46
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$32,450
Cost:
$131,351
$2,225 37,086 $917 199 $(-12,845) (-1,511) $42,234 1,926 $(-200) - $119 - $2,225
37,086
kWh
$917
199
kW-months/year
$(-12,845)
(-1,511)
MMBtu
$42,234
1,926
MMBtu
$(-200)
-
$
$119
-
$
TOTAL IMPLEMENTED Savings:
$3,768
Cost:
$3,851
$902 15,031 $341 74 - - $2,606 119 $(-200) - $119 - $902
15,031
kWh
$341
74
kW-months/year
-
-
MMBtu
$2,606
119
MMBtu
$(-200)
-
$
$119
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Ancillary Material Cost