IAC Assessment: NC0571
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0571
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2016
Principal Product Fiber optic cable
NAICS 335921 - Fiber Optic Cable Manufacturing
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 356,000
Annual Production 150,000 Thousand Feet
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $525,406 13,565,000 kWh $0.04
Electricity Demand $267,496 23,413 kW-months/year $11.43
Electricity Fees $1,268 - $ -
TOTAL ENERGY COSTS $794,170
RECOMMENDED SAVINGS* $159,955 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$59,225
Cost:
$500
$59,225 - - - - - - - $59,225
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$57,529
Cost:
$69,600
$36,316 938,400 $14,838 1,325 - - $6,375 - $36,316
938,400
kWh
$14,838
1,325
kW-months/year
-
-
$
$6,375
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,239
Cost:
$20,540
$8,890 229,722 $3,524 315 - - $825 - $8,890
229,722
kWh
$3,524
315
kW-months/year
-
-
$
$825
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,882
Cost:
$16,830
$2,836 73,269 $1,124 100 - - $922 - $2,836
73,269
kWh
$1,124
100
kW-months/year
-
-
$
$922
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,338
Cost:
$11,069
$1,124 29,039 $445 40 - - $769 - $1,124
29,039
kWh
$445
40
kW-months/year
-
-
$
$769
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,140
Cost:
$2,603
$2,140 55,289 - - - - - - $2,140
55,289
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,705
Cost:
$200
$3,212 82,994 $1,273 114 $(-300) - $(-480) - $3,212
82,994
kWh
$1,273
114
kW-months/year
$(-300)
-
$
$(-480)
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$12,346
Cost:
$12,000
$8,841 228,454 $3,505 313 - - - - $8,841
228,454
kWh
$3,505
313
kW-months/year
-
-
$
-
-
$
09: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,454
Cost:
$200
$1,454 - - - - - - - $1,454
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
10: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,097
Cost:
$5,685
$2,218 57,315 $879 78 - - - - $2,218
57,315
kWh
$879
78
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$159,955
Cost:
$139,227
$126,256 1,694,482 $25,588 2,285 $(-300) - $8,411 - $126,256
1,694,482
kWh
$25,588
2,285
kW-months/year
$(-300)
-
$
$8,411
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost