IAC Assessment: NC0611
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0611
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2018
Principal Product Plastic kitchen and trash bags
NAICS 326111 - Plastics Bag and Pouch Manufacturing
SIC 2673 - Bags: Plastics, Laminated, & Coated
Sales $100,000,000-$500,000,000
# of Employees 470
Plant Area (Sq.Ft.) 238,000
Annual Production 60,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,029,036 31,587,450 kWh $0.03
Electricity Demand $690,549 49,460 kW-months/year $13.96
Natural Gas $20,965 2,714 MMBtu $7.72
TOTAL ENERGY COSTS $1,740,550
RECOMMENDED SAVINGS* $89,389 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $75,098
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$58,179
Cost:
$92,653
$28,825 884,217 $22,180 1,590 - - $7,174 - $28,825
884,217
kWh
$22,180
1,590
kW-months/year
-
-
$
$7,174
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,370
Cost:
$200
$7,925 243,090 $4,645 333 $(-100) - $(-100) - $7,925
243,090
kWh
$4,645
333
kW-months/year
$(-100)
-
$
$(-100)
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,064
Cost:
$100
$4,454 136,616 $2,610 187 - - - - $4,454
136,616
kWh
$2,610
187
kW-months/year
-
-
$
-
-
$
04: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$7,227
Cost:
$35,000
$7,227 221,699 - - - - - - $7,227
221,699
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,887
Cost:
$5,685
$1,792 54,960 $1,095 78 - - - - $1,792
54,960
kWh
$1,095
78
kW-months/year
-
-
$
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,662
Cost:
$200
$336 - $1,326 100 - - - - $336
-
kWh
$1,326
100
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$89,389
Cost:
$133,838
$50,559 1,540,582 $31,856 2,288 $(-100) - $7,074 - $50,559
1,540,582
kWh
$31,856
2,288
kW-months/year
$(-100)
-
$
$7,074
-
$
TOTAL IMPLEMENTED Savings:
$75,098
Cost:
$98,738
$38,878 1,182,267 $29,246 2,101 $(-100) - $7,074 - $38,878
1,182,267
kWh
$29,246
2,101
kW-months/year
$(-100)
-
$
$7,074
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost