IAC logo
IAC Assessment: NC0621
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0621
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2018
Principal Product Hoses
NAICS 326220 - Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052 - Rubber & Plastics Hose & Belting
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 173,000
Annual Production 4,000,000 Units
Production Hrs. Annual 6,600
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $212,975 3,338,420 kWh $0.06
Electricity Demand $53,478 12,322 kW-months/year $4.34
Natural Gas $206,912 45,118 MMBtu $4.59
TOTAL ENERGY COSTS $473,365
RECOMMENDED SAVINGS* $52,963 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$22,870
Cost:
$54,127
$20,061 314,442 $2,809 628 - - - - - - $20,061
314,442
kWh
$2,809
628
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$134
Cost:
$150
$134 2,100 - - - - - - - - $134
2,100
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,222
Cost:
$390
$5,865 91,931 $747 167 - - $(-300) - $(-90) - $5,865
91,931
kWh
$747
167
kW-months/year
-
-
MMBtu
$(-300)
-
$
$(-90)
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$6,697
Cost:
$5,350
- - - - $6,697 1,459 - - - - -
-
kWh
-
-
kW-months/year
$6,697
1,459
MMBtu
-
-
$
-
-
$
05: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$943
Cost:
$1,000
- - - - $943 205 - - - - -
-
kWh
-
-
kW-months/year
$943
205
MMBtu
-
-
$
-
-
$
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$16,097
Cost:
$500
$16,097 - - - - - - - - - $16,097
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$52,963
Cost:
$61,517
$42,157 408,473 $3,556 795 $7,640 1,664 $(-300) - $(-90) - $42,157
408,473
kWh
$3,556
795
kW-months/year
$7,640
1,664
MMBtu
$(-300)
-
$
$(-90)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost