IAC logo
IAC Assessment: NC0626
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0626
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2019
Principal Product Electric steering units
NAICS 336330 - Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 210
Plant Area (Sq.Ft.) 125,000
Annual Production 900,000 Units
Production Hrs. Annual 6,000
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $107,107 2,208,400 kWh $0.05
Electricity Demand $61,831 4,280 kW-months/year $14.45
Natural Gas $12,554 1,679 MMBtu $7.48
TOTAL ENERGY COSTS $181,492
RECOMMENDED SAVINGS* $21,479 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,575
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,564
Cost:
$40,273
$6,855 141,341 $4,709 326 - - - - - - $6,855
141,341
kWh
$4,709
326
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$532
Cost:
$871
$532 10,976 - - - - - - - - $532
10,976
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$240
Cost:
$45
$150 3,096 $90 6 - - - - - - $150
3,096
kWh
$90
6
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,034
Cost:
$135
$1,523 31,392 $646 45 - - $(-90) - $(-45) - $1,523
31,392
kWh
$646
45
kW-months/year
-
-
MMBtu
$(-90)
-
$
$(-45)
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,962
Cost:
$4,000
- - - - $2,962 396 - - - - -
-
kWh
-
-
kW-months/year
$2,962
396
MMBtu
-
-
$
-
-
$
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,170
Cost:
$9,000
$2,170 44,760 - - - - - - - - $2,170
44,760
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,977
Cost:
$200
- - $1,977 137 - - - - - - -
-
kWh
$1,977
137
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$21,479
Cost:
$54,524
$11,230 231,565 $7,422 514 $2,962 396 $(-90) - $(-45) - $11,230
231,565
kWh
$7,422
514
kW-months/year
$2,962
396
MMBtu
$(-90)
-
$
$(-45)
-
$
TOTAL IMPLEMENTED Savings:
$15,575
Cost:
$40,608
$8,378 172,733 $7,332 508 - - $(-90) - $(-45) - $8,378
172,733
kWh
$7,332
508
kW-months/year
-
-
MMBtu
$(-90)
-
$
$(-45)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost