IAC logo
IAC Assessment: NC0639
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0639
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2019
Principal Product Cured meats and cut meats
NAICS 311612 - Meat Processed from Carcasses
SIC 2013 - Sausages And Other Prepared Meats
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 350,000
Annual Production 35,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $504,313 11,989,000 kWh $0.04
Electricity Demand $391,290 23,127 kW-months/year $16.92
Electricity Fees $(-80,372) - $ -
LPG $338,450 34,040 MMBtu $9.94
TOTAL ENERGY COSTS $1,153,681
RECOMMENDED SAVINGS* $194,382 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Water Usage Ancillary Material Cost Electricity Usage Electricity Demand LPG Water Usage Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,819
Cost:
$1,000
- - - - $1,819 183 - - - - -
-
kWh
-
-
kW-months/year
$1,819
183
MMBtu
-
-
Tgal
-
-
$
02: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$4,196
Cost:
$8,200
- - - - $2,038 205 $1,439 144 $719 - -
-
kWh
-
-
kW-months/year
$2,038
205
MMBtu
$1,439
144
Tgal
$719
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$49,700
Cost:
$125,000
- - - - $49,700 5,000 - - - - -
-
kWh
-
-
kW-months/year
$49,700
5,000
MMBtu
-
-
Tgal
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$18,727
Cost:
$25,000
$10,382 246,600 $8,345 493 - - - - - - $10,382
246,600
kWh
$8,345
493
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,235
Cost:
$31,057
$10,011 237,800 $6,224 368 - - - - - - $10,011
237,800
kWh
$6,224
368
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$103,705
Cost:
$500
$103,705 - - - - - - - - - $103,705
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$194,382
Cost:
$190,757
$124,098 484,400 $14,569 861 $53,557 5,388 $1,439 144 $719 - $124,098
484,400
kWh
$14,569
861
kW-months/year
$53,557
5,388
MMBtu
$1,439
144
Tgal
$719
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand LPG Water Usage Ancillary Material Cost Electricity Usage Electricity Demand LPG Water Usage Ancillary Material Cost