IAC logo
IAC Assessment: ND0155
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0155
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1993
Principal Product Mushrooms
NAICS n/a
SIC 2033 - Canned Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 305,000
Annual Production 14,000,000 Pounds
Production Hrs. Annual 3,822
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $446,757 8,068,289 kWh $0.06
Fuel Oil #6 $475,958 171,016 MMBtu $2.78
TOTAL ENERGY COSTS $922,715
RECOMMENDED SAVINGS* $140,377 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,666
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2
$ kWh $ MMBtu
01: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$105,938
Cost:
$35,500
- - $105,938 19,088 -
-
kWh
$105,938
19,088
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,600
Cost:
$4,745
$6,600 119,285 - - $6,600
119,285
kWh
-
-
MMBtu
03: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$13,500
Cost:
$33,750
- - $13,500 6,109 -
-
kWh
$13,500
6,109
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,317
Cost:
$8,000
- - $7,317 3,311 -
-
kWh
$7,317
3,311
MMBtu
05: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$3,842
Cost:
$40
- - $3,842 1,823 -
-
kWh
$3,842
1,823
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,724
Cost:
$3,258
$2,724 49,238 - - $2,724
49,238
kWh
-
-
MMBtu
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$332
Cost:
$890
- - $332 150 -
-
kWh
$332
150
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$109
Cost:
$200
$109 2,052 - - $109
2,052
kWh
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15
Cost:
$40
$15 293 - - $15
293
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$140,377
Cost:
$86,423
$9,448 170,868 $130,929 30,481 $9,448
170,868
kWh
$130,929
30,481
MMBtu
TOTAL IMPLEMENTED Savings:
$26,666
Cost:
$41,793
$9,324 168,523 $17,342 7,932 $9,324
168,523
kWh
$17,342
7,932
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2