IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1995
Principal Product material handling products
NAICS n/a
SIC 3535 - Conveyors And Conveying Equipment
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 30,000
Annual Production 13,000 Pieces
Production Hrs. Annual 2,470
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $84,918 912,075 kWh $0.09
Natural Gas $16,471 2,835 MMBtu $5.81
TOTAL ENERGY COSTS $195,889
RECOMMENDED SAVINGS* $24,384 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,674
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (non-haz) Electricity Usage Natural Gas Other Liquid (non-haz)
$ kWh $ MMBtu $ gal
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$874
Cost:
$850
$874 9,379 - - - - $874
9,379
kWh
-
-
MMBtu
-
-
gal
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$800
Cost:
$600
$800 8,792 - - - - $800
8,792
kWh
-
-
MMBtu
-
-
gal
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$800
Cost:
$2,000
$800 8,499 - - - - $800
8,499
kWh
-
-
MMBtu
-
-
gal
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$797
Cost:
$650
$797 8,499 - - - - $797
8,499
kWh
-
-
MMBtu
-
-
gal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$771
Cost:
$495
$771 8,206 - - - - $771
8,206
kWh
-
-
MMBtu
-
-
gal
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$689
Cost:
$5,050
$689 7,327 - - - - $689
7,327
kWh
-
-
MMBtu
-
-
gal
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$609
Cost:
$500
- - $609 105 - - -
-
kWh
$609
105
MMBtu
-
-
gal
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$357
Cost:
$375
$357 3,810 - - - - $357
3,810
kWh
-
-
MMBtu
-
-
gal
09: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$201
Cost:
$180
- - $201 35 - - -
-
kWh
$201
35
MMBtu
-
-
gal
10: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$18,486
Cost:
$2,200
- - - - $18,486 3,480 -
-
kWh
-
-
MMBtu
$18,486
3,480
gal
TOTAL RECOMMENDED Savings:
$24,384
Cost:
$12,900
$5,088 54,512 $810 140 $18,486 3,480 $5,088
54,512
kWh
$810
140
MMBtu
$18,486
3,480
gal
TOTAL IMPLEMENTED Savings:
$1,674
Cost:
$1,450
$1,674 18,171 - - - - $1,674
18,171
kWh
-
-
MMBtu
-
-
gal
Savings
Cost
$ kWh $ MMBtu $ gal
Electricity Usage Natural Gas Other Liquid (non-haz) Electricity Usage Natural Gas Other Liquid (non-haz)