IAC Assessment: NV0067
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0067
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1996
Principal Product Polyethylene Pipes
NAICS n/a
SIC 3084 - Plastics Pipe
Sales $10,000,000-$50,000,000
# of Employees 26
Plant Area (Sq.Ft.) 45,000
Annual Production 15,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $198,520 4,530,188 kWh $0.04
Electricity Demand $78,100 9,830 kW-months/year $7.95
Electricity Fees $9,003 - $ -
Natural Gas $6,129 1,181 MMBtu $5.19
TOTAL ENERGY COSTS $292,847
RECOMMENDED SAVINGS* $28,398 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,001
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,845
Cost:
$197
$4,801 109,613 $954 120 $90 - - - $4,801
109,613
kWh
$954
120
kW-months/year
$90
-
$
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$419
Cost:
$18
$335 7,620 $84 12 - - - - $335
7,620
kWh
$84
12
kW-months/year
-
-
$
-
-
lb
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,487
Cost:
$45
$2,010 45,721 $477 60 - - - - $2,010
45,721
kWh
$477
60
kW-months/year
-
-
$
-
-
lb
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,646
Cost:
$1,085
$2,646 60,375 - - - - - - $2,646
60,375
kWh
-
-
kW-months/year
-
-
$
-
-
lb
05: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$14,885
Cost:
-
- - $13,530 71 $1,355 - - - -
-
kWh
$13,530
71
kW-months/year
$1,355
-
$
-
-
lb
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,021
Cost:
-
- - - - $1,021 - - - -
-
kWh
-
-
kW-months/year
$1,021
-
$
-
-
lb
07: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$1,095
Cost:
-
- - - - - - $1,095 10,950 -
-
kWh
-
-
kW-months/year
-
-
$
$1,095
10,950
lb
TOTAL RECOMMENDED Savings:
$28,398
Cost:
$1,345
$9,792 223,329 $15,045 263 $2,466 - $1,095 10,950 $9,792
223,329
kWh
$15,045
263
kW-months/year
$2,466
-
$
$1,095
10,950
lb
TOTAL IMPLEMENTED Savings:
$17,001
Cost:
-
- - $13,530 71 $2,376 - $1,095 10,950 -
-
kWh
$13,530
71
kW-months/year
$2,376
-
$
$1,095
10,950
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz)