IAC Assessment: NV0093
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0093
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1997
Principal Product Precision Flow Regulating Equipment
NAICS n/a
SIC 3549 - Metalworking Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 128
Plant Area (Sq.Ft.) 43,000
Annual Production 80,000 Pieces
Production Hrs. Annual 4,940
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $37,483 859,027 kWh $0.04
Electricity Demand $24,082 2,595 kW-months/year $9.28
Electricity Fees $1,231 - $ -
Natural Gas $5,150 976 MMBtu $5.28
TOTAL ENERGY COSTS $139,063
RECOMMENDED SAVINGS* $80,486 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $68,175
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$458
Cost:
$300
$458 10,551 - - - - - - - - $458
10,551
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$426
Cost:
$147
$100 2,345 $326 35 - - - - - - $100
2,345
kWh
$326
35
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,377
Cost:
$850
- - - - $1,377 281 - - - - -
-
kWh
-
-
kW-months/year
$1,377
281
MMBtu
-
-
gal
-
-
lb
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$159
Cost:
$150
$159 3,517 - - - - - - - - $159
3,517
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$396
Cost:
$50
$396 9,086 - - - - - - - - $396
9,086
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,549
Cost:
$885
$2,949 67,116 $1,600 173 - - - - - - $2,949
67,116
kWh
$1,600
173
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,633
Cost:
$513
$3,725 84,701 $1,908 206 - - - - - - $3,725
84,701
kWh
$1,908
206
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$326
Cost:
$164
$248 5,569 $78 8 - - - - - - $248
5,569
kWh
$78
8
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$412
Cost:
$258
$265 6,155 $147 16 - - - - - - $265
6,155
kWh
$147
16
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
10: 3.7197 USE ULTRASONIC CLEANING Savings:
$65,000
Cost:
$16,200
- - - - - - $65,000 1,490 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$65,000
1,490
gal
-
-
lb
11: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,750
Cost:
$500
- - - - - - - - $1,750 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$1,750
-
lb
TOTAL RECOMMENDED Savings:
$80,486
Cost:
$20,017
$8,300 189,040 $4,059 438 $1,377 281 $65,000 1,490 $1,750 - $8,300
189,040
kWh
$4,059
438
kW-months/year
$1,377
281
MMBtu
$65,000
1,490
gal
$1,750
-
lb
TOTAL IMPLEMENTED Savings:
$68,175
Cost:
$17,458
$1,278 29,309 $147 16 - - $65,000 1,490 $1,750 - $1,278
29,309
kWh
$147
16
kW-months/year
-
-
MMBtu
$65,000
1,490
gal
$1,750
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz)