IAC logo
IAC Assessment: OK0077
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0077
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1983
Principal Product REINFORCED PLASTIC PIPE
NAICS n/a
SIC 3084 - Plastics Pipe
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,210
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $206,340 5,521,102 kWh $0.04
Natural Gas $229,760 74,970 MMBtu $3.06
TOTAL ENERGY COSTS $436,100
RECOMMENDED SAVINGS* $81,572 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,584
Cost:
$836
$1,584 35,756 - - $1,584
35,756
kWh
-
-
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,209
Cost:
$2,125
- - $1,209 370 -
-
kWh
$1,209
370
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,825
Cost:
$280
$4,825 175,264 - - $4,825
175,264
kWh
-
-
MMBtu
04: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$11,300
Cost:
$28,000
- - $11,300 2,764 -
-
kWh
$11,300
2,764
MMBtu
05: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$649
Cost:
$388
- - $649 162 -
-
kWh
$649
162
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$144
Cost:
$160
- - $144 44 -
-
kWh
$144
44
MMBtu
07: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$281
Cost:
$158
- - $281 69 -
-
kWh
$281
69
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$535
Cost:
$315
- - $535 139 -
-
kWh
$535
139
MMBtu
09: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$13,080
Cost:
$500
- - $13,080 4,000 -
-
kWh
$13,080
4,000
MMBtu
10: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$45,615
Cost:
-
- - $45,615 18,918 -
-
kWh
$45,615
18,918
MMBtu
11: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$2,350
Cost:
-
- - $2,350 873 -
-
kWh
$2,350
873
MMBtu
TOTAL RECOMMENDED Savings:
$81,572
Cost:
$32,762
$6,409 211,020 $75,163 27,339 $6,409
211,020
kWh
$75,163
27,339
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas