IAC logo
IAC Assessment: OK0084
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0084
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1983
Principal Product POLYETHYLENE PIPE
NAICS n/a
SIC 3084 - Plastics Pipe
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 27,600,000 Pounds
Production Hrs. Annual 8,736
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $268,521 9,028,136 kWh $0.03
Natural Gas $12,147 3,948 MMBtu $3.08
TOTAL ENERGY COSTS $280,668
RECOMMENDED SAVINGS* $11,043 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $115
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$4,150
Cost:
$913
$4,150 - - - $4,150
-
kWh
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$115
Cost:
$187
$115 5,569 - - $115
5,569
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$248
Cost:
$203
$248 4,689 - - $248
4,689
kWh
-
-
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$178
Cost:
$377
- - $178 55 -
-
kWh
$178
55
MMBtu
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$800
Cost:
$180
$800 38,687 - - $800
38,687
kWh
-
-
MMBtu
06: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$1,025
Cost:
$832
$1,025 49,824 - - $1,025
49,824
kWh
-
-
MMBtu
07: 2.2694 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE Savings:
$4,195
Cost:
$300
$4,195 203,400 - - $4,195
203,400
kWh
-
-
MMBtu
08: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$332
Cost:
$45
$332 16,120 - - $332
16,120
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$11,043
Cost:
$3,037
$10,865 318,289 $178 55 $10,865
318,289
kWh
$178
55
MMBtu
TOTAL IMPLEMENTED Savings:
$115
Cost:
$187
$115 5,569 - - $115
5,569
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas