IAC Assessment: OK0115
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0115
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1984
Principal Product SHOCK ABSORBERS
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 655
Plant Area (Sq.Ft.) 0
Annual Production 11,200,000 Pieces
Production Hrs. Annual 0
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $733,458 16,864,889 kWh $0.04
Natural Gas $196,256 40,389 MMBtu $4.86
TOTAL ENERGY COSTS $929,714
RECOMMENDED SAVINGS* $21,976 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,327
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$614
Cost:
$450
- - $614 241 - - -
-
kWh
$614
241
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,540
Cost:
$450
- - $2,600 1,020 $(-60) - -
-
kWh
$2,600
1,020
MMBtu
$(-60)
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,020
Cost:
$600
- - $1,020 400 - - -
-
kWh
$1,020
400
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$456
Cost:
$223
$456 14,947 - - - - $456
14,947
kWh
-
-
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,279
Cost:
$82
$1,279 36,928 - - - - $1,279
36,928
kWh
-
-
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,444
Cost:
$640
- - $2,444 719 - - -
-
kWh
$2,444
719
MMBtu
-
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$6,630
Cost:
-
$6,630 - - - - - $6,630
-
kWh
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$519
Cost:
$790
$519 11,430 - - - - $519
11,430
kWh
-
-
MMBtu
-
-
$
09: 2.3521 REDUCE LOAD ON ELECTRICAL CONDUCTOR TO REDUCE HEATING LOSSES Savings:
$740
Cost:
$1,125
$740 17,585 - - - - $740
17,585
kWh
-
-
MMBtu
-
-
$
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$900
Cost:
$46
- - $900 265 - - -
-
kWh
$900
265
MMBtu
-
-
$
11: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$2,676
Cost:
$278
- - $2,676 787 - - -
-
kWh
$2,676
787
MMBtu
-
-
$
12: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$356
Cost:
$371
- - $356 105 - - -
-
kWh
$356
105
MMBtu
-
-
$
13: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,802
Cost:
$200
- - $1,802 707 - - -
-
kWh
$1,802
707
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$21,976
Cost:
$5,255
$9,624 80,890 $12,412 4,244 $(-60) - $9,624
80,890
kWh
$12,412
4,244
MMBtu
$(-60)
-
$
TOTAL IMPLEMENTED Savings:
$13,327
Cost:
$4,048
$975 26,377 $12,412 4,244 $(-60) - $975
26,377
kWh
$12,412
4,244
MMBtu
$(-60)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes