IAC Assessment: OK0181
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0181
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1985
Principal Product DAIRY--ICE CREAM,YOGURT
NAICS n/a
SIC 2024 - Ice Cream And Frozen Desserts
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 0
Annual Production 7,000 Thousand Gallons
Production Hrs. Annual 8,640
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $177,162 3,798,945 kWh $0.05
Natural Gas $59,617 13,544 MMBtu $4.40
TOTAL ENERGY COSTS $236,779
RECOMMENDED SAVINGS* $10,946 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,077
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,786
Cost:
$4,300
- - $1,786 406 -
-
kWh
$1,786
406
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,120
Cost:
$6,500
- - $2,120 482 -
-
kWh
$2,120
482
MMBtu
03: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$3,832
Cost:
$2,940
- - $3,832 871 -
-
kWh
$3,832
871
MMBtu
04: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$1,131
Cost:
$579
- - $1,131 257 -
-
kWh
$1,131
257
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$649
Cost:
$592
$649 16,413 - - $649
16,413
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,428
Cost:
$57
$1,428 36,635 - - $1,428
36,635
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$10,946
Cost:
$14,968
$2,077 53,048 $8,869 2,016 $2,077
53,048
kWh
$8,869
2,016
MMBtu
TOTAL IMPLEMENTED Savings:
$2,077
Cost:
$649
$2,077 53,048 - - $2,077
53,048
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas