IAC logo
IAC Assessment: OK0186
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0186
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1986
Principal Product DIESEL ENGINE PISTON PIN
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 148
Plant Area (Sq.Ft.) 0
Annual Production 3,378,000 Pieces
Production Hrs. Annual 6,000
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $242,540 6,263,482 kWh $0.04
Natural Gas $206,409 56,973 MMBtu $3.62
TOTAL ENERGY COSTS $448,949
RECOMMENDED SAVINGS* $45,822 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,952
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$678
Cost:
$366
$678 9,965 - - - - $678
9,965
kWh
-
-
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$46
Cost:
$40
$46 879 - - - - $46
879
kWh
-
-
MMBtu
-
-
$
03: 2.2514 COVER OPEN TANKS Savings:
$3,068
Cost:
$829
$3,068 198,710 - - - - $3,068
198,710
kWh
-
-
MMBtu
-
-
$
04: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$832
Cost:
$240
- - $832 230 - - -
-
kWh
$832
230
MMBtu
-
-
$
05: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$328
Cost:
$83
- - $328 91 - - -
-
kWh
$328
91
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$15,479
Cost:
$1,500
- - $15,599 4,309 $(-120) - -
-
kWh
$15,599
4,309
MMBtu
$(-120)
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$25,391
Cost:
$21,000
- - $25,391 7,014 - - -
-
kWh
$25,391
7,014
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$45,822
Cost:
$24,058
$3,792 209,554 $42,150 11,644 $(-120) - $3,792
209,554
kWh
$42,150
11,644
MMBtu
$(-120)
-
$
TOTAL IMPLEMENTED Savings:
$4,952
Cost:
$1,558
$3,792 209,554 $1,160 321 - - $3,792
209,554
kWh
$1,160
321
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes