IAC Assessment: OK0237
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0237
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1987
Principal Product ARCHITECTURAL METALS
NAICS n/a
SIC 3446 - Architectural Metal Work
Sales $5,000,000-$10,000,000
# of Employees 110
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,210
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,442 1,024,033 kWh $0.07
Natural Gas $29,050 6,940 MMBtu $4.19
TOTAL ENERGY COSTS $101,492
RECOMMENDED SAVINGS* $19,296 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,428
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,860
Cost:
-
$4,860 - - - - - $4,860
-
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,416
Cost:
$30,755
$12,334 182,298 - - $82 - $12,334
182,298
kWh
-
-
MMBtu
$82
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$118
Cost:
-
$118 879 - - - - $118
879
kWh
-
-
MMBtu
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$216
Cost:
-
$216 3,224 - - - - $216
3,224
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$179
Cost:
$110
$197 2,638 $(-18) (-4) - - $197
2,638
kWh
$(-18)
(-4)
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,055
Cost:
$110
$1,055 33,998 - - - - $1,055
33,998
kWh
-
-
MMBtu
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$452
Cost:
$600
- - $452 108 - - -
-
kWh
$452
108
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$19,296
Cost:
$31,575
$18,780 223,037 $434 104 $82 - $18,780
223,037
kWh
$434
104
MMBtu
$82
-
$
TOTAL IMPLEMENTED Savings:
$6,428
Cost:
$220
$6,446 40,739 $(-18) (-4) - - $6,446
40,739
kWh
$(-18)
(-4)
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes