IAC logo
IAC Assessment: OK0266
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0266
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1988
Principal Product COMMERCIAL FEED
NAICS n/a
SIC 2048 - Prepared Feeds, Nec
Sales $1,000,000-$5,000,000
# of Employees 35
Plant Area (Sq.Ft.) 0
Annual Production 200,000 Tons
Production Hrs. Annual 7,300
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $165,411 3,241,794 kWh $0.05
Natural Gas $67,127 24,157 MMBtu $2.78
TOTAL ENERGY COSTS $232,538
RECOMMENDED SAVINGS* $20,245 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,021
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$15,319
Cost:
$37,200
$15,319 - - - $15,319
-
kWh
-
-
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,083
Cost:
$1,075
$1,083 - - - $1,083
-
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$162
Cost:
$329
$162 4,689 - - $162
4,689
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$693
Cost:
$945
$693 26,964 - - $693
26,964
kWh
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,764
Cost:
$7,051
$2,764 82,649 - - $2,764
82,649
kWh
-
-
MMBtu
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$224
Cost:
$312
- - $224 81 -
-
kWh
$224
81
MMBtu
TOTAL RECOMMENDED Savings:
$20,245
Cost:
$46,912
$20,021 114,302 $224 81 $20,021
114,302
kWh
$224
81
MMBtu
TOTAL IMPLEMENTED Savings:
$20,021
Cost:
$46,600
$20,021 114,302 - - $20,021
114,302
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas