IAC logo
IAC Assessment: OK0267
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0267
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1988
Principal Product FROZEN CHICKEN PIECES
NAICS n/a
SIC 2015 - Poultry Slaughtering And Processing
Sales $50,000,000-$100,000,000
# of Employees 1,000
Plant Area (Sq.Ft.) 0
Annual Production 150,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $833,170 23,448,125 kWh $0.04
Natural Gas $288,964 103,963 MMBtu $2.78
TOTAL ENERGY COSTS $1,122,134
RECOMMENDED SAVINGS* $36,382 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,715
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,200
Cost:
$1,575
$4,200 143,904 - - $4,200
143,904
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,960
Cost:
$2,787
$1,960 67,116 - - $1,960
67,116
kWh
-
-
MMBtu
03: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$642
Cost:
$184
- - $642 231 -
-
kWh
$642
231
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$728
Cost:
$312
- - $728 262 -
-
kWh
$728
262
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,028
Cost:
$2,050
- - $2,028 623 -
-
kWh
$2,028
623
MMBtu
06: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$761
Cost:
$1,380
$761 32,239 - - $761
32,239
kWh
-
-
MMBtu
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$4,601
Cost:
$300
- - $4,601 1,655 -
-
kWh
$4,601
1,655
MMBtu
08: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$11,976
Cost:
$405
$(-120) (-4,103) $12,096 4,351 $(-120)
(-4,103)
kWh
$12,096
4,351
MMBtu
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,819
Cost:
$2,370
$1,819 55,686 - - $1,819
55,686
kWh
-
-
MMBtu
10: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$7,667
Cost:
$5,510
- - $7,667 2,758 -
-
kWh
$7,667
2,758
MMBtu
TOTAL RECOMMENDED Savings:
$36,382
Cost:
$16,873
$8,620 294,842 $27,762 9,880 $8,620
294,842
kWh
$27,762
9,880
MMBtu
TOTAL IMPLEMENTED Savings:
$28,715
Cost:
$11,363
$8,620 294,842 $20,095 7,122 $8,620
294,842
kWh
$20,095
7,122
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas