IAC logo
IAC Assessment: OK0415
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0415
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1993
Principal Product Tubular Goods
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $10,000,000-$50,000,000
# of Employees 98
Plant Area (Sq.Ft.) 0
Annual Production 44,607 Tons
Production Hrs. Annual 3,432
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $359,829 6,069,461 kWh $0.06
Natural Gas $444,829 168,042 MMBtu $2.65
TOTAL ENERGY COSTS $804,658
RECOMMENDED SAVINGS* $65,281 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,517
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,868
Cost:
-
$10,868 367,526 - - $10,868
367,526
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,357
Cost:
$4,918
$6,357 121,043 - - $6,357
121,043
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,487
Cost:
$11,785
$4,487 79,719 - - $4,487
79,719
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,725
Cost:
$3,693
$1,725 37,808 - - $1,725
37,808
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$948
Cost:
$1,079
$948 20,809 - - $948
20,809
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$612
Cost:
$749
$612 10,844 - - $612
10,844
kWh
-
-
MMBtu
07: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$40,284
Cost:
$190,000
- - $40,284 15,218 -
-
kWh
$40,284
15,218
MMBtu
TOTAL RECOMMENDED Savings:
$65,281
Cost:
$212,224
$24,997 637,749 $40,284 15,218 $24,997
637,749
kWh
$40,284
15,218
MMBtu
TOTAL IMPLEMENTED Savings:
$13,517
Cost:
$21,475
$13,517 259,379 - - $13,517
259,379
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas