Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 1997 |
Principal Product | pipeline maintanance equipment |
NAICS | n/a |
SIC | 3498 - Fabricated Pipe And Fittings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 35,014,000 Pounds |
Production Hrs. Annual | 5,200 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $97,530 | 3,778,429 | kWh | $0.03 |
Electricity Demand | $89,688 | 9,017 | kW-months/year | $9.95 |
Electricity Fees | $876 | - | $ | - |
Natural Gas | $54,449 | 17,166 | MMBtu | $3.17 |
TOTAL ENERGY COSTS | $345,013 | |||
RECOMMENDED SAVINGS* | $72,463 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,195 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $844 Cost: $2,845 |
$(-159) | (-1,465) | - | - | $1,003 | 249,600 | - | - | - | - | - | - |
$(-159) (-1,465) kWh |
- - kW-months/year |
$1,003 249,600 Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $1,918 Cost: $3,500 |
$(-57) | (-2,052) | - | - | - | - | $2,695 | 338 | $(-720) | - | - | - |
$(-57) (-2,052) kWh |
- - kW-months/year |
- - Tgal |
$2,695 338 lb |
$(-720) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $103 Cost: $200 |
$203 | 7,034 | - | - | - | - | - | - | $(-100) | - | - | - |
$203 7,034 kWh |
- - kW-months/year |
- - Tgal |
- - lb |
$(-100) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $(-70) Cost: $386 |
$57 | 2,052 | $26 | 3 | - | - | - | - | $(-153) | - | - | - |
$57 2,052 kWh |
$26 3 kW-months/year |
- - Tgal |
- - lb |
$(-153) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $282 Cost: $880 |
$282 | 9,672 | - | - | - | - | - | - | - | - | - | - |
$282 9,672 kWh |
- - kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $54,126 Cost: $4,480 |
- | - | - | - | - | - | $(-558) | 148,800 | - | - | $54,684 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$(-558) 148,800 lb |
- - $ |
$54,684 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $198 Cost: - |
- | - | - | - | - | - | $198 | 9,600 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$198 9,600 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.452 ELIMINATE SHIFT |
Savings: $10,400 Cost: $200 |
- | - | - | - | - | - | - | - | $10,400 | - | - | - |
- - kWh |
- - kW-months/year |
- - Tgal |
- - lb |
$10,400 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $4,662 Cost: $15,500 |
- | - | $4,662 | 720 | - | - | - | - | - | - | - | - |
- - kWh |
$4,662 720 kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $72,463 Cost: $27,991 |
$326 | 15,241 | $4,688 | 723 | $1,003 | 249,600 | $2,335 | 158,738 | $9,427 | - | $54,684 | - | $326 15,241 kWh |
$4,688 723 kW-months/year |
$1,003 249,600 Tgal |
$2,335 158,738 lb |
$9,427 - $ |
$54,684 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,195 Cost: $7,131 |
$44 | 5,569 | $26 | 3 | $1,003 | 249,600 | $2,695 | 338 | $9,427 | - | - | - | $44 5,569 kWh |
$26 3 kW-months/year |
$1,003 249,600 Tgal |
$2,695 338 lb |
$9,427 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost |