IAC logo
IAC Assessment: OK0522
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0522
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1997
Principal Product pipeline maintanance equipment
NAICS n/a
SIC 3498 - Fabricated Pipe And Fittings
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 125,000
Annual Production 35,014,000 Pounds
Production Hrs. Annual 5,200
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $97,530 3,778,429 kWh $0.03
Electricity Demand $89,688 9,017 kW-months/year $9.95
Electricity Fees $876 - $ -
Natural Gas $54,449 17,166 MMBtu $3.17
TOTAL ENERGY COSTS $345,013
RECOMMENDED SAVINGS* $72,463 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,195
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$844
Cost:
$2,845
$(-159) (-1,465) - - $1,003 249,600 - - - - - - $(-159)
(-1,465)
kWh
-
-
kW-months/year
$1,003
249,600
Tgal
-
-
lb
-
-
$
-
-
$
02: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,918
Cost:
$3,500
$(-57) (-2,052) - - - - $2,695 338 $(-720) - - - $(-57)
(-2,052)
kWh
-
-
kW-months/year
-
-
Tgal
$2,695
338
lb
$(-720)
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$103
Cost:
$200
$203 7,034 - - - - - - $(-100) - - - $203
7,034
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$(-100)
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$(-70)
Cost:
$386
$57 2,052 $26 3 - - - - $(-153) - - - $57
2,052
kWh
$26
3
kW-months/year
-
-
Tgal
-
-
lb
$(-153)
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$282
Cost:
$880
$282 9,672 - - - - - - - - - - $282
9,672
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$54,126
Cost:
$4,480
- - - - - - $(-558) 148,800 - - $54,684 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$(-558)
148,800
lb
-
-
$
$54,684
-
$
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$198
Cost:
-
- - - - - - $198 9,600 - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$198
9,600
lb
-
-
$
-
-
$
08: 4.4520 ELIMINATE SHIFT Savings:
$10,400
Cost:
$200
- - - - - - - - $10,400 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$10,400
-
$
-
-
$
09: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$4,662
Cost:
$15,500
- - $4,662 720 - - - - - - - - -
-
kWh
$4,662
720
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$72,463
Cost:
$27,991
$326 15,241 $4,688 723 $1,003 249,600 $2,335 158,738 $9,427 - $54,684 - $326
15,241
kWh
$4,688
723
kW-months/year
$1,003
249,600
Tgal
$2,335
158,738
lb
$9,427
-
$
$54,684
-
$
TOTAL IMPLEMENTED Savings:
$13,195
Cost:
$7,131
$44 5,569 $26 3 $1,003 249,600 $2,695 338 $9,427 - - - $44
5,569
kWh
$26
3
kW-months/year
$1,003
249,600
Tgal
$2,695
338
lb
$9,427
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost