IAC logo
IAC Assessment: OK0582
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0582
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1999
Principal Product Automobile seals
NAICS n/a
SIC 3052 - Rubber & Plastics Hose & Belting
Sales $10,000,000-$50,000,000
# of Employees 438
Plant Area (Sq.Ft.) 150,000
Annual Production 11,000,000 Pounds
Production Hrs. Annual 5,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $693,264 23,337,632 kWh $0.03
Electricity Demand $286,519 44,080 kW-months/year $6.50
Natural Gas $87,827 28,331 MMBtu $3.10
TOTAL ENERGY COSTS $1,327,610
RECOMMENDED SAVINGS* $146,134 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$17,137
Cost:
$21,900
$11,351 374,560 $10,380 1,597 $(-4,594) (-320) - - - - $11,351
374,560
kWh
$10,380
1,597
kW-months/year
$(-4,594)
(-320)
MMBtu
-
-
lb
-
-
$
02: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$2,848
Cost:
$2,000
$2,848 94,959 - - - - - - - - $2,848
94,959
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$5,367
Cost:
$1,070
$3,698 123,388 $1,669 257 - - - - - - $3,698
123,388
kWh
$1,669
257
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,573
Cost:
$3,864
$8,709 290,445 $3,864 605 - - - - - - $8,709
290,445
kWh
$3,864
605
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$13,559
Cost:
$6,500
$9,336 311,841 $4,223 650 - - - - - - $9,336
311,841
kWh
$4,223
650
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 4.4240 IMPROVE SPACE COMFORT CONDITIONING Savings:
$56,000
Cost:
$165,000
- - - - - - - - $56,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$56,000
-
$
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$38,250
Cost:
$10,000
- - - - - - $38,250 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$38,250
-
lb
-
-
$
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$400
Cost:
-
- - - - - - $400 24,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$400
24,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$146,134
Cost:
$210,334
$35,942 1,195,193 $20,136 3,109 $(-4,594) (-320) $38,650 24,000 $56,000 - $35,942
1,195,193
kWh
$20,136
3,109
kW-months/year
$(-4,594)
(-320)
MMBtu
$38,650
24,000
lb
$56,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Ancillary Material Cost