IAC logo
IAC Assessment: OK0587
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0587
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1999
Principal Product Feeds
NAICS n/a
SIC 2048 - Prepared Feeds, Nec
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 34,000
Annual Production 210,000 Units
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $139,666 4,886,284 kWh $0.03
Electricity Demand $31,289 - kW-months/year -
Electricity Fees $(-21,028) - $ -
Natural Gas $91,252 29,193 MMBtu $3.13
TOTAL ENERGY COSTS $275,014
RECOMMENDED SAVINGS* $51,762 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 4.4440 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$20,078
Cost:
$2,250
- - - - - - $20,078 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$20,078
-
$
-
-
$
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$16,905
Cost:
-
- - $16,905 3,312 - - - - - - - - -
-
kWh
$16,905
3,312
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$7,398
Cost:
$31,705
- - - - - - - - $7,398 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$7,398
-
$
-
-
$
04: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$3,795
Cost:
-
- - - - - - - - - - $3,795 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$3,795
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,193
Cost:
$3,150
- - - - $2,193 701 - - - - - - -
-
kWh
-
-
kW-months/year
$2,193
701
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$891
Cost:
$24
$271 10,551 $620 14 - - - - - - - - $271
10,551
kWh
$620
14
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$252
Cost:
$1,028
- - $252 81 - - - - - - - - -
-
kWh
$252
81
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$250
Cost:
$525
- - $250 80 - - - - - - - - -
-
kWh
$250
80
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$51,762
Cost:
$38,682
$271 10,551 $18,027 3,487 $2,193 701 $20,078 - $7,398 - $3,795 - $271
10,551
kWh
$18,027
3,487
kW-months/year
$2,193
701
MMBtu
$20,078
-
$
$7,398
-
$
$3,795
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material