IAC Assessment: OR0046
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0046
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1989
Principal Product BEEF CUTS & POULTRY FEED
NAICS n/a
SIC 2011 - Meat Packing Plants
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 0
Annual Production 85,000,000 Pounds
Production Hrs. Annual 2,040
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $174,893 6,636,870 kWh $0.03
Natural Gas $231,988 52,886 MMBtu $4.39
TOTAL ENERGY COSTS $406,881
RECOMMENDED SAVINGS* $32,700 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,742
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$3,516
Cost:
-
$3,516 135,111 - - - - $3,516
135,111
kWh
-
-
MMBtu
-
-
$
02: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$1,907
Cost:
-
$1,907 73,271 - - - - $1,907
73,271
kWh
-
-
MMBtu
-
-
$
03: 2.2123 INSULATE FEEDWATER TANK Savings:
$678
Cost:
$259
- - $678 154 - - -
-
kWh
$678
154
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$106
Cost:
$100
$106 4,103 - - - - $106
4,103
kWh
-
-
MMBtu
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,640
Cost:
$4,500
$4,640 - - - - - $4,640
-
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,573
Cost:
$42,000
$5,366 206,331 - - $16,207 - $5,366
206,331
kWh
-
-
MMBtu
$16,207
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$280
Cost:
$500
$280 10,844 - - - - $280
10,844
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$32,700
Cost:
$47,359
$15,815 429,660 $678 154 $16,207 - $15,815
429,660
kWh
$678
154
MMBtu
$16,207
-
$
TOTAL IMPLEMENTED Savings:
$31,742
Cost:
$46,600
$15,535 418,816 - - $16,207 - $15,535
418,816
kWh
-
-
MMBtu
$16,207
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes