IAC Assessment: OR0062
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0062
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1989
Principal Product COMPOSITE PANELS
NAICS n/a
SIC 2493 - Reconstituted Wood Products
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 797,739 Pieces
Production Hrs. Annual 8,736
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $320,137 7,822,685 kWh $0.04
Natural Gas $281,445 68,461 MMBtu $4.11
Wood $59,442 53,380 MMBtu $1.11
TOTAL ENERGY COSTS $661,024
RECOMMENDED SAVINGS* $11,556 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,906
#|Description Savings
Cost
Status Electricity Usage Natural Gas Wood Administrative Changes Electricity Usage Natural Gas Wood Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$1,178
Cost:
$418
- - $1,042 253 $136 123 - - -
-
kWh
$1,042
253
MMBtu
$136
123
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,507
Cost:
$768
$1,507 36,635 - - - - - - $1,507
36,635
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$500
Cost:
$255
- - $443 108 $57 52 - - -
-
kWh
$443
108
MMBtu
$57
52
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,561
Cost:
$1,210
$814 19,930 - - - - $747 - $814
19,930
kWh
-
-
MMBtu
-
-
MMBtu
$747
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$518
Cost:
$467
$809 19,637 - - - - $(-291) - $809
19,637
kWh
-
-
MMBtu
-
-
MMBtu
$(-291)
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$227
Cost:
$300
$227 5,569 - - - - - - $227
5,569
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$642
Cost:
$1,144
$1,417 34,584 - - - - $(-775) - $1,417
34,584
kWh
-
-
MMBtu
-
-
MMBtu
$(-775)
-
$
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,423
Cost:
$11,400
$5,423 - - - - - - - $5,423
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$11,556
Cost:
$15,962
$10,197 116,355 $1,485 361 $193 175 $(-319) - $10,197
116,355
kWh
$1,485
361
MMBtu
$193
175
MMBtu
$(-319)
-
$
TOTAL IMPLEMENTED Savings:
$5,906
Cost:
$4,262
$4,547 110,786 $1,485 361 $193 175 $(-319) - $4,547
110,786
kWh
$1,485
361
MMBtu
$193
175
MMBtu
$(-319)
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Wood Administrative Changes Electricity Usage Natural Gas Wood Administrative Changes