IAC Assessment: OR0111
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0111
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1991
Principal Product WOOLEN TEXTILES
NAICS n/a
SIC 2231 - Broadwoven Fabric Mills, Wool
Sales $1,000,000-$5,000,000
# of Employees 25
Plant Area (Sq.Ft.) 0
Annual Production 135,000,000 Pieces
Production Hrs. Annual 3,920
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $22,414 408,851 kWh $0.05
Natural Gas $42,007 10,754 MMBtu $3.91
TOTAL ENERGY COSTS $64,421
RECOMMENDED SAVINGS* $5,875 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,875
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2123 INSULATE FEEDWATER TANK Savings:
$879
Cost:
$379
- - $879 236 - - -
-
kWh
$879
236
MMBtu
-
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$232
Cost:
-
$171 5,275 - - $61 - $171
5,275
kWh
-
-
MMBtu
$61
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$877
Cost:
$500
- - $877 236 - - -
-
kWh
$877
236
MMBtu
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,153
Cost:
-
$782 23,447 - - $371 - $782
23,447
kWh
-
-
MMBtu
$371
-
$
05: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$240
Cost:
$470
- - $240 65 - - -
-
kWh
$240
65
MMBtu
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$638
Cost:
$1,350
$638 - - - - - $638
-
kWh
-
-
MMBtu
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$272
Cost:
$671
- - $272 73 - - -
-
kWh
$272
73
MMBtu
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$58
Cost:
$240
$58 1,172 - - - - $58
1,172
kWh
-
-
MMBtu
-
-
$
09: 2.5191 MODIFY DYE BECK Savings:
$1,526
Cost:
$6,422
- - $1,526 410 - - -
-
kWh
$1,526
410
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$5,875
Cost:
$10,032
$1,649 29,894 $3,794 1,020 $432 - $1,649
29,894
kWh
$3,794
1,020
MMBtu
$432
-
$
TOTAL IMPLEMENTED Savings:
$5,875
Cost:
$10,032
$1,649 29,894 $3,794 1,020 $432 - $1,649
29,894
kWh
$3,794
1,020
MMBtu
$432
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes