Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1992
Principal Product STEEL CASTINGS
NAICS n/a
SIC 3325 - Steel Foundries, Nec
Sales $5,000,000-$10,000,000
# of Employees 258
Plant Area (Sq.Ft.) 0
Annual Production 2,822 Tons
Production Hrs. Annual 2,880
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $717,399 14,153,283 kWh $0.05
Natural Gas $214,298 71,433 MMBtu $3.00
TOTAL ENERGY COSTS $931,697
RECOMMENDED SAVINGS* $54,448 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,181
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$289
Cost:
-
$289 5,862 - - $289
5,862
kWh
-
-
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,784
Cost:
$2,920
$5,784 157,093 - - $5,784
157,093
kWh
-
-
MMBtu
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$524
Cost:
$750
$524 - - - $524
-
kWh
-
-
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,666
Cost:
$5,359
$1,666 35,170 - - $1,666
35,170
kWh
-
-
MMBtu
05: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM Savings:
$4,388
Cost:
$14,272
- - $4,388 1,463 -
-
kWh
$4,388
1,463
MMBtu
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$26,207
Cost:
$150,000
$26,207 259,672 - - $26,207
259,672
kWh
-
-
MMBtu
07: 2.5194 REDESIGN PROCESS Savings:
$15,590
Cost:
$130,000
$15,590 282,239 - - $15,590
282,239
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$54,448
Cost:
$303,301
$50,060 740,036 $4,388 1,463 $50,060
740,036
kWh
$4,388
1,463
MMBtu
TOTAL IMPLEMENTED Savings:
$34,181
Cost:
$159,029
$34,181 451,935 - - $34,181
451,935
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas