IAC logo
IAC Assessment: OR0203
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0203
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1994
Principal Product Resins and Fromaldehyde
NAICS n/a
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 25
Plant Area (Sq.Ft.) 0
Annual Production 207,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $555,130 15,165,299 kWh $0.04
Natural Gas $26,346 4,781 MMBtu $5.51
TOTAL ENERGY COSTS $581,476
RECOMMENDED SAVINGS* $369,502 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $218,253
#|Description Savings
Cost
Status Electricity Usage Gaseous Waste Primary Product Electricity Usage Gaseous Waste Primary Product
$ kWh $ lb $ $
01: 2.6125 KEEP EQUIPMENT CLEAN Savings:
$6,615
Cost:
$467
$6,615 178,195 - - - - $6,615
178,195
kWh
-
-
lb
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$12,138
Cost:
-
$12,138 370,164 - - - - $12,138
370,164
kWh
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$623
Cost:
$1,856
$623 14,947 - - - - $623
14,947
kWh
-
-
lb
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,177
Cost:
$18,729
$9,177 235,932 - - - - $9,177
235,932
kWh
-
-
lb
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,249
Cost:
$3,500
$1,249 - - - - - $1,249
-
kWh
-
-
lb
-
-
$
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$150,000
Cost:
$200,000
- - - - $150,000 - -
-
kWh
-
-
lb
$150,000
-
$
07: 3.3126 USE ABSORPTION, EXTRACTION TO REMOVE CONTAMINANTS Savings:
$189,700
Cost:
$636,100
$(-49,500) (-485,639) $239,200 636,400 - - $(-49,500)
(-485,639)
kWh
$239,200
636,400
lb
-
-
$
TOTAL RECOMMENDED Savings:
$369,502
Cost:
$860,652
$(-19,698) 313,599 $239,200 636,400 $150,000 - $(-19,698)
313,599
kWh
$239,200
636,400
lb
$150,000
-
$
TOTAL IMPLEMENTED Savings:
$218,253
Cost:
$657,152
$(-20,947) 313,599 $239,200 636,400 - - $(-20,947)
313,599
kWh
$239,200
636,400
lb
-
-
$
Savings
Cost
$ kWh $ lb $ $
Electricity Usage Gaseous Waste Primary Product Electricity Usage Gaseous Waste Primary Product