Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1994 |
Principal Product | Resins and Fromaldehyde |
NAICS | n/a |
SIC | 2869 - Industrial Organic Chemicals, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 25 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 207,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $555,130 | 15,165,299 | kWh | $0.04 |
Natural Gas | $26,346 | 4,781 | MMBtu | $5.51 |
TOTAL ENERGY COSTS | $581,476 | |||
RECOMMENDED SAVINGS* | $369,502 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $218,253 |
#|Description |
Savings Cost |
Status | Electricity Usage | Gaseous Waste | Primary Product | Electricity Usage | Gaseous Waste | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6125 KEEP EQUIPMENT CLEAN |
Savings: $6,615 Cost: $467 |
$6,615 | 178,195 | - | - | - | - |
$6,615 178,195 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $12,138 Cost: - |
$12,138 | 370,164 | - | - | - | - |
$12,138 370,164 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $623 Cost: $1,856 |
$623 | 14,947 | - | - | - | - |
$623 14,947 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $9,177 Cost: $18,729 |
$9,177 | 235,932 | - | - | - | - |
$9,177 235,932 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $1,249 Cost: $3,500 |
$1,249 | - | - | - | - | - |
$1,249 - kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $150,000 Cost: $200,000 |
- | - | - | - | $150,000 | - |
- - kWh |
- - lb |
$150,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.3126 USE ABSORPTION, EXTRACTION TO REMOVE CONTAMINANTS |
Savings: $189,700 Cost: $636,100 |
$(-49,500) | (-485,639) | $239,200 | 636,400 | - | - |
$(-49,500) (-485,639) kWh |
$239,200 636,400 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $369,502 Cost: $860,652 |
$(-19,698) | 313,599 | $239,200 | 636,400 | $150,000 | - | $(-19,698) 313,599 kWh |
$239,200 636,400 lb |
$150,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $218,253 Cost: $657,152 |
$(-20,947) | 313,599 | $239,200 | 636,400 | - | - | $(-20,947) 313,599 kWh |
$239,200 636,400 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Gaseous Waste | Primary Product | Electricity Usage | Gaseous Waste | Primary Product |