IAC logo
IAC Assessment: OR0242
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0242
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1995
Principal Product ferous castings
NAICS n/a
SIC 3321 - Gray And Ductile Iron Foundries
Sales $10,000,000-$50,000,000
# of Employees 155
Plant Area (Sq.Ft.) 68,260
Annual Production 25,700,000 Pounds
Production Hrs. Annual 7,200
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $644,179 12,883,939 kWh $0.05
Natural Gas $61,023 14,286 MMBtu $4.27
Other Energy $32,396 928 MMBtu $34.91
TOTAL ENERGY COSTS $1,129,899
RECOMMENDED SAVINGS* $431,077 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $176,906
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Natural Gas Other Energy Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ MMBtu $ MMBtu $ lb $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,846
Cost:
$20,911
$10,846 240,328 - - - - - - - - - - - - $10,846
240,328
kWh
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$5,468
Cost:
$200
$5,468 140,094 - - - - - - - - - - - - $5,468
140,094
kWh
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,005
Cost:
$2,912
$1,005 19,050 - - - - - - - - - - - - $1,005
19,050
kWh
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$2,587
Cost:
$3,400
- - - - - - - - - - $2,587 - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
$2,587
-
$
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,971
Cost:
$6,800
$1,971 - - - - - - - - - - - - - $1,971
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$89,600
Cost:
$225,000
- - $17,600 4,640 - - - - $72,000 - - - - - -
-
kWh
$17,600
4,640
MMBtu
-
-
MMBtu
-
-
lb
$72,000
-
$
-
-
$
-
-
$
07: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$22,000
Cost:
$1,000
- - $(-5,000) (-928) $27,000 928 - - - - - - - - -
-
kWh
$(-5,000)
(-928)
MMBtu
$27,000
928
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
08: 3.5222 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) Savings:
$140,600
Cost:
$168,000
- - - - - - $50,000 1,530,000 $39,600 - - - $51,000 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$50,000
1,530,000
lb
$39,600
-
$
-
-
$
$51,000
-
$
09: 3.5222 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) Savings:
$157,000
Cost:
$1,200
- - - - - - $157,000 - - - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$157,000
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$431,077
Cost:
$429,423
$19,290 399,472 $12,600 3,712 $27,000 928 $207,000 1,530,000 $111,600 - $2,587 - $51,000 - $19,290
399,472
kWh
$12,600
3,712
MMBtu
$27,000
928
MMBtu
$207,000
1,530,000
lb
$111,600
-
$
$2,587
-
$
$51,000
-
$
TOTAL IMPLEMENTED Savings:
$176,906
Cost:
$28,623
$17,319 399,472 - - - - $157,000 - - - $2,587 - - - $17,319
399,472
kWh
-
-
MMBtu
-
-
MMBtu
$157,000
-
lb
-
-
$
$2,587
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Natural Gas Other Energy Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Natural Gas Other Energy Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material